My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to OEA - Design Replacement Floor Slab Orchestra Level Morris – Frost Engineering & Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to OEA - Design Replacement Floor Slab Orchestra Level Morris – Frost Engineering & Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:22:19 AM
Creation date
10/27/2021 9:22:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated May 11, 2021. <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. __2___ <br />1.Background Data: <br />a.Effective Date of Owner-Engineer Agreement:May 11, 2021 <br />b.Owner:Board of Public Works, City of South Bend, Indiana <br />c.Engineer: Frost Engineering & Consulting <br />d.Project:121-029 Morris Performing Arts Center Main Level Slab Replacement <br />2.Description of Modifications: <br />a.Engineer shall perform or furnish the following Additional Services: <br />1)Please see the attached Appendix 1 to Exhibit A (Revision 2) for tasks specific to <br />each project. Current revisions are noted in italics. <br />b.The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />1)Please see the attached Appendix 1 to Exhibit A (Revision 2) for tasks specific to <br />each project. Tasks removed from the scope of services have been struck through. <br />c.For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />1)Please see the attached Appendix 1 to Exhibit A (Revision 2) for tasks specific to <br />each project. Current revisions are noted in italics. <br />5. Agreement Summary (Reference only) <br />a.Original Agreement amount:$_167,355___ <br />b. Net change for prior amendments:$_-4,005_______ _ <br />c. This amendment amount:$_0____ <br />d. Adjusted Agreement amount:$_163,350___ <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C.
The URL can be used to link to this page
Your browser does not support the video tag.