My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Resolutions
>
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:20:49 AM
Creation date
10/27/2021 9:19:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 3 – STORMWATER <br />34 <br />A sediment filter shall be attached to the end of the dewatering discharge pipe. The sediment filter <br />shall be monitored and changed as necessary. The discharge points for the dewatering system shall <br />be approved by the City Engineer prior to commencing construction. <br />3-3.3 (e) STORM SEWER SYSTEM INSTALLATION <br />3-3.3 (e) (i) INSPECTION FOR DEFECTS <br />Before installation, the pipe shall be inspected for defects. Material found to be defective before or <br />after laying shall be replaced with sound material. <br />3-3.3 (e) (ii) CARE OF PIPE <br />Handle pipe and accessories so as to ensure delivery to the trench in sound, undamaged condition. <br />Particular care shall be taken not to damage the pipe coating or lining. If the coating or lining of <br />any pipe or fitting is damaged, it shall be repaired immediately. <br />No other pipe or material of any kind shall be placed inside a pipe or fitting after the coating has <br />been applied. Pipe shall be carried into position and not dragged. Use of pinch bars and tongs for <br />aligning or tuning pipe will be permitted only on the bare ends of the pipe. <br />The interior of pipe and accessories shall be thoroughly cleaned of foreign matter before being <br />lowered into the trench and shall be kept clean during laying operations by plugging or other <br />approved method. <br />3-3.3 (e) (iii) PIPE JOINTS <br />Prior to making pipe joints, clean and dry all surfaces of pipe joints and jointing material. Use <br />lubricants, primers, adhesives, and similar materials as recommended by the manufacturers. Place, <br />fit, joint, and adjust the jointing materials or factory fabricated joints as recommended by the <br />manufacturer to obtain the degree of water tightness required. As soon as possible after the joint is <br />made, place sufficient backfill material along each side of the pipe to resist forces that might tend <br />to move the pipe off line and grade. <br />3-3.3 (e) (iv) PIPE LAYING <br />1.) Pipe and accessories shall be carefully lowered into the trench by means of derrick, ropes, <br />belts, slings, or other authorized equipment. Under no circumstance shall any sewer-line <br />materials be dropped or dumped into the trench. Care shall be taken to avoid abrasion of <br />the pipe coating. <br />2.) Except where necessary in making connections with other lines or as authorized by the Engineer, <br />pipe shall be laid with the bells facing in the direction of laying.
The URL can be used to link to this page
Your browser does not support the video tag.