My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Resolutions
>
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:20:49 AM
Creation date
10/27/2021 9:19:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 3 – STORMWATER <br />32 <br />3-3.2 (d) (vi) END SECTION <br />End Sections shall conform to INDOT Standard Specifications Sections 715.02, 908.06 for metal pipe <br />end sections, and 905.06 for precast concrete end sections. <br />3-3.2 (d) (vii) SLOTTED DRAIN <br />Slotted drains shall only be installed upon the prior approval of the City Engineer and shall be designed <br />and constructed in accordance with Indiana Design Manual Section 203-4.04(10) and INDOT <br />Standard Specifications Section 908.14, respectively. <br />3-3.2 (d) (viii) HEAD WALL <br />Headwalls shall be designed in accordance with Indiana Design Manual Section 203-2.06(1). <br />3-3.3 CONSTRUCTION METHODS <br />3-3.3 (a) GENERAL <br />Schedule for all work shall be provided and coordinated with the City Engineer. <br />All sewer system component installations are subject to inspection by the Project Representative <br />and civil authorities having jurisdiction. <br />3-3.3 (b) SHUT DOWN OF EXISTING PIPES <br />3-3.3 (b) (i) GENERAL <br />Provide for the flow of stormwater around the manhole and section, or sections, of pipe designated <br />for storm pipe installation or replacement, storm manhole installation or replacement, CIPP <br />rehabilitation, manhole structural rehabilitation, and manhole non-structural lining. The bypass <br />shall be made by plugging the line at an existing upstream manhole and pumping the flow into a <br />downstream manhole. The pump and bypass lines where applied shall be of adequate capacity and <br />size to handle the flow and submitted by a Professional Engineer registered in the State of Indiana. <br />If the bypass flow is being discharged to a different existing sewer network, the design engineer <br />shall also provide information showing that the sewer network has sufficient capacity for the <br />additional flow. Bypass to a different sewer network must be approved by the City Engineer. <br />3-3.3 (c) EXCAVATION <br />3-3.3 (c) (i) GENERAL <br />Excavation shall comply with INDOT Standard Specifications Section 203.
The URL can be used to link to this page
Your browser does not support the video tag.