My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Resolutions
>
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:20:49 AM
Creation date
10/27/2021 9:19:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
10/27/2021 9:20 AM
Modified:
10/27/2021 9:20 AM
Text:
https://southbendin.gov/department/building/building-permits/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 3 – STORMWATER <br />28 <br />3-1.8 STORAGE FACILITY REQUIREMENTS <br />1.) Detention Basins Design <br />i.Minimum longitudinal and transverse bottom slopes of 1.0% unless underdrains are <br />provided <br />ii.Vegetated side slopes of the basin shall not exceed 4 foot horizontal to 1 foot vertical <br />(4:1) <br />iii.Storage depth shall not exceed 4 feet without approval <br />2.) Retention Basins Design <br />i.A maintenance ledge at least 6 foot in width placed 1 foot vertically above the normal <br />pool elevation <br />ii.A safety ledge of at least 6 foot in width placed 1.5 feet vertically below the normal <br />pool elevation <br />iii.Side slopes below the safety ledge shall not exceed two foot horizontal to 1 foot vertical <br />(2:1) <br />iv.Vegetated side slopes above the maintenance ledge shall not exceed 4:1 <br />v.The average permanent pool elevation of the basin shall be at least 4 feet in depth with <br />at least 25% of the basin being 8 feet in depth <br />vi.Fencing or a barrier is recommended around the perimeter <br />3.) Outlet control structures shall be designed to operate as simply as possible without manual <br />operation and shall require little or no maintenance and/or attention for proper operation. <br />4.) The storage facility owner shall be responsible for storage facility access and maintenance, <br />including the removal of accumulated sediment and debris. The owner shall maintain records <br />of storage facility maintenance operations and provide them to the City upon request. The City <br />may perform periodic inspection of storage facilities and require sediment removal and <br />associated storage facility maintenance at the owner’s expense. <br />5.) A geotechnical investigation should be performed to determine the anticipated soil conditions <br />at the site. If infiltration release is considered in the calculation the geotechnical investigation <br />should provide recommended infiltration rates. At a minimum, soil maps from USGS should <br />be provided, along with the anticipated soil infiltration rates to be encountered. If soils within <br />Soil Groups C or D are indicated, infiltration may not be a viable option. <br />6.) A storage facility located adjacent to a roadway should be provided with an adequate <br />recoverable slope or clear zone offset from the AASHTO Roadside Design Guide to minimize
The URL can be used to link to this page
Your browser does not support the video tag.