My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Resolutions
>
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:20:49 AM
Creation date
10/27/2021 9:19:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
10/27/2021 9:20 AM
Modified:
10/27/2021 9:20 AM
Text:
https://www.in.gov/dnr/water/3593.htm
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 3 – STORMWATER <br />26 <br />3-1.5 FLOOD ROUTING AND EMERGENCY SPILLWAY <br />1.) Stormwater basins shall have a secondary outfall (emergency spillway) that is designed to pass <br />the peak 100-year inflow. <br />2.) The spillway must direct the emergency overflows away from buildings and other structures. <br />3.) Overflow paths throughout the development resulting from the peak 100-year storm event, <br />shall be determined, clearly shown on the plans and contained in permanent drainage <br />easements. <br />4.) Emergency spillways must be resistant to vertical movement; concrete grade beams, if present, <br />must extend below frost line. <br />3-1.6 FREEBOARD AND FLOOD PROTECTION GRADE <br />1.) Stormwater storage facilities shall have a minimum of 1-foot freeboard. Freeboard is the <br />vertical difference between the storage facility’s top and the water surface resulting from the <br />peak 100-year passing over the emergency spillway. <br />i.All berms and levees shall not be considered a regulated dam as specified in Indiana <br />Department of Natural Resources’ (IDNR) Indiana Dam Safety Inspection Manual. <br />2.) All buildings adjacent to a stormwater storage facility or in the overflow path shall have a <br />Minimum Flood Protection Grade established. The elevation shall be 2 feet above the water <br />surface elevation of the peak 100-year inflow passing over the emergency spillway (1 foot <br />above the freeboard elevation).
The URL can be used to link to this page
Your browser does not support the video tag.