My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Resolutions
>
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:20:49 AM
Creation date
10/27/2021 9:19:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 3 – STORMWATER <br />24 <br /> Table 4: NOAA Atlas 14 First Quartile, Median 24-hr Rainfall Distribution <br />Cumulative <br />Time <br />(%) <br />Cumulative <br />Precipitation <br />(%) <br />0% 0% <br />5% 12% <br />10% 27% <br />15% 40% <br />20% 51% <br />25% 61% <br />30% 68% <br />35% 73% <br />40% 78% <br />45% 82% <br />50% 85% <br />55% 88% <br />60% 91% <br />65% 93% <br />70% 95% <br />75% 97% <br />80% 98% <br />85% 99% <br />90% 99.5% <br />95% 99.8% <br />100% 100% <br />5.) Allowable Concentrated Release Rate <br />i.Calculations shall be performed for a 24-hour duration storm for existing and proposed <br />conditions to determine discharge rates produced and storage required. <br />ii.The maximum allowable release rate for storage facilities shall not exceed the <br />downstream channel capacity or 10-year predeveloped rate. Note that releases from <br />the storage facility due to infiltration are not considered as part of the release rate <br />requirement because they are not part of the concentrated discharge release at the <br />outlet. <br />iii.Discharge control structures shall be multi-stage and capable of limiting 2, 10, and <br />100-year storms to the minimum requirements outlined in the previous section.
The URL can be used to link to this page
Your browser does not support the video tag.