My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Resolutions
>
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:20:49 AM
Creation date
10/27/2021 9:19:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 36-2021 <br />A RESOLUTION OF THE BOARD OF PUBLIC WORKS OF THE CITY OF <br />SOUTH BEND, INDIANA ADOPTING REVISED CONSTRUCTION STANDARDS AND <br />SPECIFICATIONS <br />______________________________________________________________________________ <br /> <br />WHEREAS, pursuant to Ind. Code § 36-1-12 et seq. as amended from time to time, the <br />City of South Bend, Indiana Board of Public Works (“Board”) has authority over construction of <br />“public works” as defined by I.C. § 36-1-12-2; and <br /> <br /> WHEREAS, the Board’s duties include but are not limited to establishing the <br />Specifications and Construction standards to be used by all firms or companies entering into an <br />agreement or contract with the City of South Bend Board for design and construction of Public <br />Works projects; and <br /> <br />WHEREAS, the Board last approved a revision of the Construction Standards and <br />Specifications to be used for City of South Bend Public Works Projects at its meeting held on <br />October 13, 2020; and <br /> <br /> WHEREAS, the Engineering Division of the City of South Bend (the City) Department <br />of Public works has recently undertaken the review and revision of the Construction Standards & <br />Specifications governing Public Works projects within the City and has made and recommended <br />changes to gate valve, hydrant, and structure casting standards and specifications for equal <br />products, a copy of which is attached hereto as Exhibit A. <br /> <br /> NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF PUBLIC WORKS OF <br />THE CITY OF SOUTH BEND, INDIANA, AS FOLLOWS: <br /> <br /> Section I. Section 5-2.5(a) Gate Valve, Section 5-2.6 Fire Hydrant Assembly, Standard 5- <br />8 Typical Gate Valve and Box, of the Construction Standards and Specifications is deleted in its <br />entirety and replaced by Exhibit A, attached hereto and incorporated herein by reference. The <br />amended sections and standards of the Construction Standards and Specifications is hereby <br />adopted and approved and shall be used by all firms or companies entering into an agreement or <br />contract with the City of South Bend Board of Public Works. <br /> <br /> Section II. Standard 4-6 Typical Manhole Casting & Adjusting Rings, Standard 3-5 <br />Typical Structure Castings & Adjusting Rings, 3-6, 3-7, 3-9, of the Construction Standards and <br />Specifications is deleted in its entirety and replaced by Exhibit A, attached hereto and incorporated <br />herein by reference. The amended sections and standards of the Construction Standards and <br />Specifications is hereby adopted and approved and shall be used by all firms or companies entering <br />into an agreement or contract with the City of South Bend Board of Public Works. <br /> <br />Section III. This Resolution shall be in full force and effect as of the date of its adoption <br />by the Board. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.