My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - City of SB Wayfinding Signage Program - Phase II Proj No. 120-020 - Geograph Industries, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Change Orders
>
Change Order No 2 - City of SB Wayfinding Signage Program - Phase II Proj No. 120-020 - Geograph Industries, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:10:46 AM
Creation date
10/27/2021 9:10:43 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: _______________ Project Name: __________________________ Change Order #: ____ <br />DATE INITIATED:BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Attachments: (List documents support change –required) <br />Amount of ܆Increase / ܆Decrease: $____________________Categories (Pick One): <br />܆ Scope of Work <br />܆ Differing Site Conditions, Changed Conditions <br />܆ Conflicted Specifications and Drawings <br />܆ Failed Materials <br />܆ Error <br />܆ Omission <br />܆ Final Quantity Adjustment <br />܆ _______________________ <br />Previously approved Change Order(s): $___________________ <br />Current Percent of Change: ____________________ % <br />New Total Amount: $____________________ <br />Total Percent of Change: ____________________ % <br />Funding Secured From: __________________________ <br />(filled out by PM) <br />RECOMMENDED BY: <br />Project Inspector (Print Name)(Signature)(Date) <br />REVIEWED BY: <br />Construction Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name)(Signature)(Date) <br />+PTI&INFS <br />"EKVTUNFOUUP'JOBM2VBOUJUJFT <br /> <br />re)e <br />10/1/2021Leslie Biek, PE Leslie Biek <br />120-020 COSB Wayfinding Signage Program, Phase 2 2 <br />9/22/2021 <br />2,900.00 <br />2,745.00 <br />-1.94 <br />$146,411.00 <br />-.11 <br />Toy Villa <br />09/24/2021
The URL can be used to link to this page
Your browser does not support the video tag.