My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Coal Line Trail Phase II Proj No. 115-064 - HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposals - Coal Line Trail Phase II Proj No. 115-064 - HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:04:54 AM
Creation date
10/27/2021 9:04:29 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TEAM PROJECT APPROACH RELEVANT EXPERIENCE 3HWC ENGINEERING | CITY OF SOUTH BEND: COAL LINE TRAIL (PHASE II)FIRM OVERVIEW <br />95% <br />HWC ENGINEERING <br />13.1 Construction Inspection <br />5% MCCORMICK <br />ENGINEERING, LLC (DBE) <br />13.1 Construction Inspection <br />PROJECT TEAM <br /> ASSISTANT CITY ENGINEER | KYLE SILVEUS, PE <br />CHRIS HOLTH <br />Project Supervisor <br />HWC ENGINEERING <br />TRACY MCCORMICK, PE <br />Construction Inspector <br />MCCORMICK ENGINEERING <br />KRISTAL GARCIA <br />Construction Inspector <br />HWC ENGINEERING <br />CITY OF <br />SOUTH BEND <br />JON DAY <br />Inspection Services Manager <br />HWC ENGINEERING
The URL can be used to link to this page
Your browser does not support the video tag.