My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Coal Line Trail Phase II Proj No. 115-064 - DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposals - Coal Line Trail Phase II Proj No. 115-064 - DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:04:29 AM
Creation date
10/27/2021 9:04:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend | Coal Line Trail (Phase II) | Construction Engineering Services | 6 <br />PROJECT UNDERSTANDING <br />Constructing this important link in our Community’s trail network will require <br />listening to homeowners, an understanding of Notre Dame traffic patterns/ <br />events, and the experience needed to efficiently rehabilitate a railroad <br />bridge over the St. Joseph River. We kept these factos at the forefront as we <br />developed our project understanding. <br /> <br />This trail is Phase II of a multi-phase project that connects Lincolnway West <br />at the intersection of Wilbur Street and Lincolnway, to the existing East Bank <br />Trail near the intersection of Angela Boulevard and North Michigan Street. <br />The Phase I portion of the trail is currently under construction and is expected <br />to be completed yet this year. The Phase II portion is located between <br />Riverside Drive and the East Bank Trail. Most of the proposed trail will be a <br />10- to 12-foot-wide asphalt multi-use path with lighting and benches along <br />the project’s entire length. Approximately 500-feet of 24-inch pipe will be <br />installed and conveyed to an existing ditch that will be used to fix a flooding <br />issue at the east end of the trail in a future project. The project also includes <br />the rehabilitation of the abandoned 337-foot Norfolk Southern Railroad <br />Bridge over the St. Joseph River. A rest area plaza will be constructed on the <br />west side of the bridge. The plaza will include a pavilion, limestone seatwall, <br />bike repair station, and drinking fountain. A proposed rest node area will <br />also be constructed at Iroquois Street. The overall project is scheduled to be <br />completed in August 2022, before the first Notre Dame home football game. <br />Proposed Plaza Location Proposed Iroquois Node End of Coal Line Trail near East Bank Trail <br />1 2 3 <br />1 2 3
The URL can be used to link to this page
Your browser does not support the video tag.