My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Coal Line Trail Phase II Proj No. 115-064 - DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposals - Coal Line Trail Phase II Proj No. 115-064 - DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:04:29 AM
Creation date
10/27/2021 9:04:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend | Coal Line Trail (Phase II) | Construction Engineering Services | 10 <br />PROJECT <br />EXPERIENCE <br />DLZ professionals strive to provide <br />unmatched client service while meeting <br />all of a project’s objectives. The firm’s <br />engineers, architects, planners, and <br />technical support staff are innovative <br />and understand that every project is <br />different. The professionals at DLZ have <br />the experience and expertise to realize that <br />each client’s needs and wants are unique. <br />We approach each project with this in mind <br />and we stand behind the work that we do. <br />STELLAR TRAIL <br />North Liberty, Indiana <br />Construction engineering services were provided for the construction of a new 4,600-foot asphalt <br />trail that connects Tamarack Trail to School Trail. A 400-foot boardwalk was constructed along <br />an existing wetland area just east of North Liberty School. The boardwalk consisted of helical <br />piles, concrete end bents, and treated lumber. Construction of the project also included subgrade <br />treatment, compacted aggregate, and seeding. Coordination for the project included maintenance <br />of traffic, staging of construction, construction schedule, and material testing.
The URL can be used to link to this page
Your browser does not support the video tag.