Laserfiche WebLink
City of South Bend <br />Coal Line Trail Phase II <br />October 26, 2021 <br />Page 8 <br />RELEVANT EXPERIENCE <br />SOUTH MAIN STREET STREETSCAPE IMPROVEMENTS <br />City of Elkhart, IN <br />CLIENT <br />City of Elkhart <br />Jeff Schaffer <br />574.293.2572 <br />TIME PERIOD <br />2017 - Present <br />PROJECT TEAM <br />Jason Durr <br />Mike Carey <br />PROJECT HIGHLIGHTS <br />• Extensive public involvement <br />phase which included <br />neighborhood meetings <br />• Challenging drainage design to <br />stay within current right-of-way <br />• Main route to multiple schools <br />meant increased pedestrian traffic <br />• Proposed improvements <br />including curb, pave drain gutter, <br />drainage swales, sidewalk, multi- <br />use path, and a chicane for traffic <br />calming <br />• PaveDrain gutter above an <br />infiltration system to collect <br />runoff and improve water quality <br />PROJECT HIGHLIGHTS <br />• Topographic survey <br />• Geotechnical investigation <br />• Community engagement <br />• Concept development <br />• Design <br />• Rule 5 Permit <br />• Bidding assistance <br />CLIENT <br />City of Columbus <br />Dave Hayward <br />812.376.2540 <br />TIME PERIOD <br />2006 - 2013 <br />2016 - 2019 <br />PROJECT TEAM <br />Jason Durr <br />WESTENEDGE DRIVE IMPROVEMENTS <br />City of Columbus, IN