City of South Bend
<br />Coal Line Trail Phase II
<br />October 26, 2021
<br />Page 4
<br />PROJECT TEAM
<br />EDUCATION
<br />Bachelor of Science
<br /> Civil Engineering
<br /> Michigan State University
<br />REGISTRATIONS
<br />Professional Engineer
<br /> IN, MI
<br />CERTIFICATIONS
<br />FEMA Certified
<br /> IS-00100, PW
<br />FEMA Certified IS-00200
<br />With nearly two and a half decades of experience,
<br />Jason serves as Burke’s director of northern Indiana.
<br />His experience in both engineering and environmental
<br />roles has allowed him to develop an understanding of
<br />not only infrastructure needs and requirements, but
<br />also the ability to design and manage projects as an
<br />environmental steward. He is also active in the Indiana
<br />chapter of the American Society of Civil Engineers,
<br />having served on the board for the past four years.
<br />RELEVANT EXPERIENCE
<br />• Boland Drive Improvements Construction
<br />Inspection, South Bend, IN
<br />• South Main Street Streetscape, Elkhart, IN
<br />• Berens Monaldi Drainage and Roadway
<br />Improvements, Dyer, IN
<br />• Ireland Road Intersection Improvements, South
<br />Bend, IN
<br />• Mascot Hall of Fame Site and Parking Lot
<br />Design, Whiting, IN
<br />• 117th Street Sewer and Water Replacement
<br />Project, Whiting, IN
<br />• Beckett’s Run Relocation Project,
<br />Fort Wayne, IN
<br />• Upper Beaver Lake East Lateral Ditches,
<br />Newton County, IN
<br />• Eisenhower Detention Basin Design and
<br />Downstream Drainage Report, Warsaw, IN
<br />• Weasel Creek Regulated Drain Maintenance
<br />Design, Grant County, IN
<br />• 5 Points Utility Relocation Report,
<br />South Bend, IN
<br />EDUCATION
<br />Bachelor of Science
<br /> Mechanical Eng. Tech.
<br /> Purdue North Central
<br />CERTIFICATIONS
<br />American Concrete Institute -
<br /> Concrete Field Testing
<br /> Technician - Grade I
<br />Confined Space Entry
<br />OSHA Construction Safety
<br /> and Health
<br />INDOT Certified Technician:
<br />• Bridge Construction &
<br />Deck Repair
<br />• Construction Earthworks
<br />• Constr. Procedures Part 1
<br />• Constr. Procedures Part 2
<br />• Hot Mix Asphalt Paving
<br />• Concrete Paving
<br />Mike will lead the Burke team for the Coal Line Trail
<br />project. He has nearly 15 years of experience, including
<br />working for South Bend’s engineering department,
<br />giving him a familiarity with municipal projects and
<br />procedures. Mike’s responsibilities include planning,
<br />analysis, design, and review of site development,
<br />utility and stormwater, and roadway design projects.
<br />He coordinates with clients and government agencies,
<br />prepares contract documents, and assists with project
<br />bidding and construction administration.
<br />RELEVANT EXPERIENCE
<br />• Boland Drive Improvements Construction
<br />Inspection, South Bend, IN
<br />• Berens Monaldi Neighborhood Drainage and
<br />Roadway Improvements, Dyer, IN
<br />• South Main Street Streetscape Improvements,
<br />Elkhart, IN
<br />• High and Ireland Intersection Improvements,
<br />South Bend, IN
<br />• Weasel Creek Regulated Drain Maintenance
<br />Design, Grant County, IN
<br />• Chet Waggoner Court Construction
<br />Observation, South Bend, IN
<br />• Eisenhower Detention Basin Design,
<br />Warsaw, IN
<br />• Carmel Creek Floodway Permit and Letter of
<br />Map Revision, Carmel, IN
<br />• Sheetz Hardiman Tile Reconstruction, Benton
<br />County, IN
<br />• Mascot Hall of Fame Site and Parking Lot
<br />Design, Whiting, IN
<br />JASON DURR, PE
<br />Project Manager / Principal in Charge
<br />MIKE CAREY
<br />Project Engineer / Project Supervisor
|