Laserfiche WebLink
City of South Bend <br />Coal Line Trail Phase II <br />October 26, 2021 <br />Page 4 <br />PROJECT TEAM <br />EDUCATION <br />Bachelor of Science <br /> Civil Engineering <br /> Michigan State University <br />REGISTRATIONS <br />Professional Engineer <br /> IN, MI <br />CERTIFICATIONS <br />FEMA Certified <br /> IS-00100, PW <br />FEMA Certified IS-00200 <br />With nearly two and a half decades of experience, <br />Jason serves as Burke’s director of northern Indiana. <br />His experience in both engineering and environmental <br />roles has allowed him to develop an understanding of <br />not only infrastructure needs and requirements, but <br />also the ability to design and manage projects as an <br />environmental steward. He is also active in the Indiana <br />chapter of the American Society of Civil Engineers, <br />having served on the board for the past four years. <br />RELEVANT EXPERIENCE <br />• Boland Drive Improvements Construction <br />Inspection, South Bend, IN <br />• South Main Street Streetscape, Elkhart, IN <br />• Berens Monaldi Drainage and Roadway <br />Improvements, Dyer, IN <br />• Ireland Road Intersection Improvements, South <br />Bend, IN <br />• Mascot Hall of Fame Site and Parking Lot <br />Design, Whiting, IN <br />• 117th Street Sewer and Water Replacement <br />Project, Whiting, IN <br />• Beckett’s Run Relocation Project, <br />Fort Wayne, IN <br />• Upper Beaver Lake East Lateral Ditches, <br />Newton County, IN <br />• Eisenhower Detention Basin Design and <br />Downstream Drainage Report, Warsaw, IN <br />• Weasel Creek Regulated Drain Maintenance <br />Design, Grant County, IN <br />• 5 Points Utility Relocation Report, <br />South Bend, IN <br />EDUCATION <br />Bachelor of Science <br /> Mechanical Eng. Tech. <br /> Purdue North Central <br />CERTIFICATIONS <br />American Concrete Institute - <br /> Concrete Field Testing <br /> Technician - Grade I <br />Confined Space Entry <br />OSHA Construction Safety <br /> and Health <br />INDOT Certified Technician: <br />• Bridge Construction & <br />Deck Repair <br />• Construction Earthworks <br />• Constr. Procedures Part 1 <br />• Constr. Procedures Part 2 <br />• Hot Mix Asphalt Paving <br />• Concrete Paving <br />Mike will lead the Burke team for the Coal Line Trail <br />project. He has nearly 15 years of experience, including <br />working for South Bend’s engineering department, <br />giving him a familiarity with municipal projects and <br />procedures. Mike’s responsibilities include planning, <br />analysis, design, and review of site development, <br />utility and stormwater, and roadway design projects. <br />He coordinates with clients and government agencies, <br />prepares contract documents, and assists with project <br />bidding and construction administration. <br />RELEVANT EXPERIENCE <br />• Boland Drive Improvements Construction <br />Inspection, South Bend, IN <br />• Berens Monaldi Neighborhood Drainage and <br />Roadway Improvements, Dyer, IN <br />• South Main Street Streetscape Improvements, <br />Elkhart, IN <br />• High and Ireland Intersection Improvements, <br />South Bend, IN <br />• Weasel Creek Regulated Drain Maintenance <br />Design, Grant County, IN <br />• Chet Waggoner Court Construction <br />Observation, South Bend, IN <br />• Eisenhower Detention Basin Design, <br />Warsaw, IN <br />• Carmel Creek Floodway Permit and Letter of <br />Map Revision, Carmel, IN <br />• Sheetz Hardiman Tile Reconstruction, Benton <br />County, IN <br />• Mascot Hall of Fame Site and Parking Lot <br />Design, Whiting, IN <br />JASON DURR, PE <br />Project Manager / Principal in Charge <br />MIKE CAREY <br />Project Engineer / Project Supervisor