Laserfiche WebLink
The new pay items have been added to the itemized proposal for the two (2) intersections <br />involved, and Special Provision XXXI, "Traffic Signal System Improvements" has been revised <br />to address the added pay items, as attached to this Addendum. The entire current itemized <br />proposal section is attached to this Addendum for all divisions, to be used for bidding. Also <br />attached to this Addendum are updated plan sheets 3 of 6 and 6 of 6 as revised for the added pay <br />items. All service point work, included but not limited to the constructing of the conduit for <br />service point shall be included in the cost of the established pay item for new service point. <br />5. The Bidders are advised that the attached, four (4) page "City of South Bend's Guidelines For <br />Good Faith Efforts By Contractors In Meeting MWBE Contract Goals" is herein added to the <br />Contract Documents. The Bidder shall consider these added "guidelines" to be inserted into the <br />"Contract Documents and Specifications" of the Bid Documents immediately after "Minority and <br />Women Business Enterprise Inclusion Program Plan" on page 5 of the General Conditions. <br />6. The Bidders are advised that Special Provision XXXI "Traffic Signal System Improvements" Part <br />7 has been revised to exclude pavement milling, removal, and patching, except minor incidental <br />pavement reconstruction as needed to remove and replace the loop detector housing for Division <br />5, E. Ireland Road/S. St. Joseph Street intersection. All roadway loop work, including but not <br />limited to the removal and replacement of the loop detector housing and related minor pavement <br />reconstruction shall be included in the cost of the established pay item "Replace Roadway Loops, <br />3 EA & Detector Housing". The entire revised Special Provision XXXI is attached to this <br />Addendum. <br />7. Regarding Item 3 of Special Provision XXXI., "Traffic Signal System Improvements", all <br />construction shall be in accordance with "Gridsmart" Specifications, including equipment and <br />processor capabilities. The Awarded Contractor may propose an alternate hemispherical camera <br />detection system, in which case it shall be the Awarded Contractor's responsibility to prove the <br />proposed alternate system to be an "Approved Equal" system as specified in the Contract <br />Documents, subject to the City of South Bend's review and approval prior to proceeding with the <br />work. <br />8. The Bidders are advised that in connection with Addendum No. 1 plan changes, the MBE and <br />WBE goals for this project are revised as follows: <br />MBE —1.6% <br />WBE — 4.5% <br />Attached to this Addendum are the affected pages of the Contract Documents. <br />