REGULAR MEETING
<br />MAY 12, 2008
<br />•
<br />281 Class A High Early Strength Concrete
<br />lu
<br />29 � Demurrage Fee MIN NO BID $ NO BID
<br />Total Amount of Bid (Items I through 29) $ 2,231,000.00
<br />ITEM
<br />HMA Binder No. 8 or 9 MAC 10 o MAC 20
<br />i
<br />11
<br />with SBS
<br />1,000
<br />TON
<br />$29.00
<br />$ 29,000.0O
<br />12
<br />HIVIA Binder No. 8 or 9 MAC HD with SBS
<br />500
<br />TON
<br />$29.00
<br />$ 14
<br />13
<br />HMA Binder No. 8 or 9 Limestone or Slag
<br />2,000
<br />TON
<br />$28.00
<br />$ 56,000.00,
<br />14
<br />HMA Binder No. 8 or 9 Limestone or Slag
<br />38.
<br />Sla
<br />_z?�l
<br />Sand
<br />5,000
<br />MAC 10 or MAC 20 with SBS
<br />1,000
<br />TON
<br />$29.00
<br />$ 29,000.0
<br />15
<br />HMA Binder No. 8 or 9 Limestone or Slag
<br />5,000
<br />TON
<br />NO BID
<br />$
<br />MAC HD with SBS
<br />500
<br />TON
<br />$29.00
<br />$ 14,500.00
<br />16
<br />HMA Binder No. 11 No Local Gravel)
<br />2,000
<br />TON
<br />$35.00
<br />$ 70,000,00 -J
<br />17
<br />HMA Binder No. 11 MAC 10 or MAC 20
<br />5,000
<br />TON
<br />i
<br />l i
<br />$
<br />with SBS
<br />1,000
<br />TON
<br />$42.00
<br />$ 42,000.00
<br />18
<br />HIVIA Binder No. 11 MAC HD with SBS
<br />500
<br />TON
<br />$44.00
<br />$ 22,000 0fl
<br />19
<br />HMA Binder No. 11 Limestone or Slag_
<br />4,000
<br />TON
<br />$36.00
<br />$ 144,000.00
<br />20
<br />HMA Binder No. 11 Limestone or Slag
<br />Total Amount
<br />of Bid (Ite
<br />MAC 10 or MAC 20 with SBS
<br />2,000
<br />TON
<br />$44.00
<br />$ 88,000.00
<br />21
<br />HMA Binder No. 11 Limestone or Slag
<br />MAC HD with SBS
<br />1,000
<br />TON
<br />$44.00
<br />$ 44,000.0
<br />22
<br />HMA Base No. 510 Limestone or Slag
<br />6,000
<br />TON
<br />$27.00
<br />$ _162,000.00
<br />23
<br />HMA Base No. 5D Limestone or Slag MAC
<br />10 or MAC 20 with SBS
<br />1,000
<br />TON
<br />$28.00
<br />$ 28,000.00
<br />24
<br />HMA Base No. 5D Limestone or Slag MAC
<br />HD with SBS
<br />1,000
<br />TON
<br />$28.00
<br />$ 28,000.00
<br />25
<br />High Performance Cold Patch
<br />3,000
<br />TON
<br />$78.00
<br />$ 234,000.00
<br />26
<br />Bituminous Patch, Material Special AE-
<br />300P (Delivered)
<br />300
<br />TON
<br />$50.00
<br />$ 15,000.00
<br />•
<br />281 Class A High Early Strength Concrete
<br />lu
<br />29 � Demurrage Fee MIN NO BID $ NO BID
<br />Total Amount of Bid (Items I through 29) $ 2,231,000.00
<br />ITEM
<br />NO.
<br />DESCRIPTION
<br />QUANTITY
<br />NO.
<br />UNIT PRICE
<br />TOTAL AMOUNT
<br />1/2
<br />Sasobit 1 % of the Liquid Bituminous
<br />UNIT
<br />JUNIT
<br />TOTAL AMOUNT'
<br />'
<br />30.
<br />Weight- Unit Cost is Cost Added for Each
<br />3,000
<br />$1.25
<br />NO BID
<br />$
<br />Ton of Material Delivered
<br />38.
<br />Sla
<br />_z?�l
<br />Sand
<br />AGGREGATE MATERIALS
<br />IT
<br />NO.
<br />DESCRIPTION
<br />QUANTITY
<br />UNIT
<br />UNIT PRICE
<br />TOTAL AMOUNT'
<br />37-
<br />Slag/Gravel
<br />- Chips
<br />3,000
<br />TON
<br />NO BID
<br />$
<br />NO BID
<br />38.
<br />Sla
<br />_z?�l
<br />Sand
<br />5,000
<br />TON
<br />NO BID
<br />$
<br />NO BID
<br />39-
<br />No.
<br />24 Sand
<br />5,000
<br />TON
<br />NO BID
<br />$
<br />--NO B'D_____�
<br />40-
<br />No.
<br />53 Gravel No Local Gravel)
<br />5,000
<br />TON
<br />NO BID
<br />$
<br />NO BID
<br />41
<br />No.
<br />53 Recycled Concrete
<br />5,000
<br />TON
<br />$9.00
<br />$
<br />45,000.00
<br />42-
<br />No.
<br />53 Slag
<br />5,000
<br />TON
<br />NO BID
<br />$
<br />- NO B : D
<br />Total Amount
<br />of Bid (Ite
<br />_45,000.03x),
<br />GREG ETTL
<br />P.O. Box 2384
<br />South Bend, Indiana 46680
<br />
|