My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 5 to OEA - Construction Admin. Support for St. Joe North Shore Bank Stabilization – Cardno, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 5 to OEA - Construction Admin. Support for St. Joe North Shore Bank Stabilization – Cardno, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2021 2:01:15 PM
Creation date
10/12/2021 2:01:12 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated November 12, 2018. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 5 <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />November 12, 2018 <br /> <br />b. <br /> <br />Owner: <br /> <br />Board of Public Works, City of South Bend, Indiana <br /> <br />c. <br /> <br />Engineer: <br /> <br />Cardno, Inc. <br /> <br />d. <br /> <br />Project: <br /> <br />St. Joseph River Bank Stabilization LARE Feasibility: Riverside Drive at <br />Yukon <br /> <br />2. Description of Modifications: <br /> <br />a. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br /> <br />Engineer shall provide bid support, construction administration support, grant reporting, <br />and as-built/final reporting for the construction phase of the Riverside Drive <br />Stabilization Project. <br />Tasks include: <br />-Update of bid documents to bring plans and specifications in agreement with <br />requirements of Great Lakes Sediment and Nutrient Reduction Program (GLSNRP) and <br />Indiana Department of Natural Resources (IDNR) Lake and River Enhancement <br />(LARE) program. Further all right-of-entry documents will be incorporated into <br />specifications <br />-Prebid meeting (1 visit) <br />-Issue addenda and address contractor questions <br />-Preconstruction meeting (1 visit) <br />-Projet kickoff meeting for Great Lakes Commission & LARE staff (1 visit) <br />-Project materials approval <br />-Weekly site inspections/visits during construction (Up to 12 visits)
The URL can be used to link to this page
Your browser does not support the video tag.