My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - WWTP Masonry Improvements Gallery Bldgs. 1-4 Proj No. 120-036 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Change Orders
>
Change Order No 1 - WWTP Masonry Improvements Gallery Bldgs. 1-4 Proj No. 120-036 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2021 1:57:42 PM
Creation date
10/12/2021 1:57:39 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br /> <br /> <br />TO: Members of the Board of Public Works <br />Clara McDaniels, Assistant City Attorney Public Works <br />Anne Fuchs, Clerk <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: 120-036 WWTP Masonry Improvements Gallery Buildings 1-4 <br />(PROJ00000217; PO-00005683) <br />Agenda Request – Change Order No. 1 <br />DATE: October 5, 2021 <br /> <br />The Division of Engineering and Division of Utilities recommend the Board of Public Works approve <br />Change Order No. 1 for Project No. 120-036 WWTP Masonry Improvements Gallery Buildings 1-4 <br />in the amount of $20,486.00 and a 150-day time extension. <br /> <br />Slatile Roofing and Sheet Metal has submitted Change Order No. 1 which includes the replacement <br />of damaged and heavily corroded steel lintels (unforeseen condition) at Gallery Buildings No. 1, 2, <br />and 4; removal of embedded electrical conduits and wiring at Gallery Building No. 2; and demolition <br />of abandoned boiler piping at Gallery No. 4. <br /> <br />The 150-day time extension accounts for the adjustment in time for a delayed start for the grouting <br />work since the project was awarded late in 2020 and the work could not begin until late winter / <br />early spring 2021 due to temperature constraints on the grout product. There were also materials <br />procurement delays that impacted schedule due to steel supply fabrication schedules. <br /> <br />The funding source for the change order shall be Account 642-06-605-514-442005. <br /> <br />For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. 9496) at <br />the Division of Engineering.
The URL can be used to link to this page
Your browser does not support the video tag.