Laserfiche WebLink
<br />Version 08/25/2021 Page - 17 Public Works Quote <br />approved non-shrinking additive or a non-shrink, non-metallic cementation grout in accordance with <br />ASTM C 1107. Grout shall be colored to match adjacent construction or as approved by the <br />Owner/Engineer. <br />Alternatively, any existing masonry that is damaged by the grout injection operation may be <br />removed/replaced in accordance with Section 4 – Interior Pipe Penetration Repair. <br /> <br />E. Measurement and Payment <br /> <br />The Contractor shall be paid for on a per cubic yard basis for grout installed and accepted by the <br />Owner/Engineer. The Contractor shall note that the Owner/Engineer must be present at time of <br />installation for acceptance. <br /> <br />F. Definition of Contract Items <br /> <br />Item No. Unit Description <br />5.1 CYD Grout Injection <br /> <br /> <br />