My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Engineering Services & Prep. Construction Documents Four (4) Intersection - Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Engineering Services & Prep. Construction Documents Four (4) Intersection - Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:07:21 PM
Creation date
9/28/2021 4:07:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/28/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLIENT: <br /> 315 W. Jefferson Blvd.PROJECT: <br /> South Bend, IN 46601 <br />No.Total Total <br />Shts. Principal PM - PE Proj. Engr-PE Staff Engr CAD Tech Sr. PE Hours Cost <br />Setup Base Drawing 8 8 <br />Utility Investigation 2 2 <br />Conceptual Configurations 2 4 8 14 <br />City Work Session 1 1 1 3 <br />0 <br />Cover Sheet 1 1 <br />Develop Preliminary Typical Sections 2 2 <br />Develop Preliminary Plan Sheets 8 8 <br />Establish Grade Controls & Set Preliminary Grades 4 8 12 <br />Design Water Main and Service Replacement 2 8 10 <br />Design Drainage & Storm Sewer 4 8 12 <br />Preliminary Phasing & Maintenance of Traffic 2 2 <br />Develop Preliminary Lighting Plan 1 4 5 <br />Preliminary Cross Sections 1 6 7 <br />Preliminary Signage and Pavement Marking 1 2 3 <br />Preliminary Approach Table 1 4 5 <br />Preliminary Structure Data Sheet 1 6 7 <br />Prepare Draft Bid Documents & Special Provisions 8 4 4 16 <br />QA/QC 4 4 <br />Preliminary Quantities 3 3 <br />60% Cost Estimate 2 2 <br />60% Design Review Meeting with City 2 2 4 <br />Field Check Meeting with City 1 1 2 <br />Total Hours 3 8 28 68 17 8 132 <br />Cost per Hour $260.00 $179.00 $179.00 $104.00 $92.00 $204.00 <br />Total Cost by Classification $780.00 $1,432.00 $5,012.00 $7,072.00 $1,564.00 $1,632.00 $17,492.00 <br />Budget $17,500.00 <br />APPENDIX "A-1" <br />PRELIMINARY DESIGN <br />Staffhour Justifcation <br />Twyckenham and Longfellow <br />DESCRIPTION <br />STAFFHOURS BY CLASSIFICATION <br />Neighborhood Infrastructure Projects <br />July 1, 2021 <br />Abonmarche Consultants, Inc.City of South Bend
The URL can be used to link to this page
Your browser does not support the video tag.