Laserfiche WebLink
Page 6 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Accordingly, Engineer neither guarantees the performance of any Contractor nor <br />assumes responsibility for any Contractor’s failure to furnish or perform the Work in <br />accordance with the Contract Documents. <br />8.Defective Work: DELETED <br />9.Clarifications and Interpretations; Field Orders: Issue necessary clarifications and <br />interpretations of the Contract Documents as appropriate to the orderly completion of <br />Contractor’s work. Such clarifications and interpretations will be consistent with the intent <br />of and reasonably inferable from the Contract Documents. Subject to any limitations in the <br />Contract Documents, Engineer may issue field orders authorizing minor variations in the <br />Work from the requirements of the Contract Documents. <br />10.Change Orders and Work Change Directives: DELETED <br />11.Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for conformance with the information given in the Contract Documents <br />and compatibility with the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. Such reviews and approvals or other action will <br />not extend to means, methods, techniques, sequences, or procedures of construction or to <br />safety precautions and programs incident thereto. Engineer shall meet any Contractor’s <br />submittal schedule that Engineer has accepted. <br />12.Substitutes and “or-equal”: Evaluate and determine the acceptability of substitute or “or- <br />equal” materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />13.Inspections and Tests: DELETED <br />14.Disagreements between Owner and Contractor: DELETED <br />15.Applications for Payment: DELETED <br />16.Contractor’s Completion Documents: DELETED <br />17.Substantial Completion: DELETED <br />18.Additional Tasks: Perform or provide the following additional Construction Phase tasks or <br />deliverables: None <br />19.Final Notice of Acceptability of the Work: DELETED <br />B.Duration of Construction Phase: The Construction Phase will commence with the execution of <br />the first Construction Contract for the Project or any part thereof and will terminate upon written <br />recommendation by Engineer for final payment to Contractors. If the Project involves more than <br />one prime contract as indicated in Paragraph A1.03.C, then Construction Phase services may be <br />rendered at different times in respect to the separate contracts. Subject to the provisions of Article <br />3, Engineer shall be entitled to an equitable increase in compensation if Construction Phase