Laserfiche WebLink
Page 3 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright ©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />1. amounts due Engineer will be increased at the rate of 1.0% per month (or the <br />maximum rate of interest permitted by law, if less) from said thirtieth day; and <br />2. Engineer may, after giving seven days written notice to Owner, suspend services under <br />this Agreement until Owner has paid in full all non-disputed amounts due for <br />services, expenses, and other related charges. Owner waives any and all claims against <br />Engineer for any such suspension. <br />C.Disputed Invoices: If Owner contests an invoice, Owner shall promptly advise Engineer of the <br />specific basis for doing so, may withhold only that portion so contested, and must pay the <br />undisputed portion. <br />D.Legislative Actions: If after the Effective Date any governmental entity takes a legislative action <br />that imposes taxes, fees, or charges on Engineer’s services or compensation under this <br />Agreement, then the Engineer may invoice such new taxes, fees, or charges as a Reimbursable <br />Expense to which a factor of 1.0 shall be applied. Owner shall reimburse Engineer for the cost <br />of such invoiced new taxes, fees, and charges; such reimbursement shall be in addition to the <br />compensation to which Engineer is entitled under the terms of Exhibit C. <br />ARTICLE 5 –OPINIONS OF COST <br />5.01 Opinions of Probable Construction Cost <br />A. Engineer’s opinions of probable Construction Cost are to be made on the basis of Engineer’s <br />experience and qualifications and represent Engineer’s best judgment as an experienced and <br />qualified professional generally familiar with the construction industry. However, because <br />Engineer has no control over the cost of labor, materials, equipment, or services furnished by <br />others, or over contractors’ methods of determining prices, or over competitive bidding or <br />market conditions, Engineer cannot and does not guarantee that proposals, bids, or actual <br />Construction Cost will not vary from opinions of probable Construction Cost prepared by <br />Engineer. If Owner requires greater assurance as to probable Construction Cost, Owner must <br />employ an independent cost estimator as provided in Exhibit B. <br />5.02 Designing to Construction Cost Limit <br />A. If a Construction Cost limit is established between Owner and Engineer, such Construction Cost <br />limit and a statement of Engineer’s rights and responsibilities with respect thereto will be <br />specifically set forth in Exhibit F, “Construction Cost Limit,” to this Agreement. <br />5.03 Opinions of Total Project Costs <br />A. The services, if any, of Engineer with respect to Total Project Costs shall be limited to assisting <br />the Owner in collating the various cost categories which comprise Total Project Costs. Engineer <br />assumes no responsibility for the accuracy of any opinions of Total Project Costs.