Laserfiche WebLink
Page 13 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright ©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />6.Construction Cost – The cost to Owner of those portions of the entire Project designed <br />or specified by Engineer. Construction Cost does not include costs of services of <br />Engineer or other design professionals and consultants; cost of land or rights-of-way, or <br />compensation for damages to properties; Owner’s costs for legal, accounting, insurance <br />counseling or auditing services; interest or financing charges incurred in connection with <br />the Project; or the cost of other services to be provided by others to Owner pursuant to <br />Exhibit B of this Agreement. Construction Cost is one of the items comprising Total <br />Project Costs. <br />7.Constituent of Concern – Any substance, product, waste, or other material of any <br />nature whatsoever (including, but not limited to, Asbestos, Petroleum, Radioactive <br />Material, and PCBs) which is or becomes listed, regulated, or addressed pursuant to (a) <br />the Comprehensive Environmental Response, Compensation and Liability Act, 42 <br />U.S.C. §§9601 et seq. (“CERCLA”); (b) the Hazardous Materials Transportation Act, <br />49 U.S.C. §§1801 et seq.; (c) the Resource Conservation and Recovery Act, 42 U.S.C. <br />§§6901 et seq. (“RCRA”); (d) the Toxic Substances Control Act, 15 U.S.C. §§2601 et <br />seq.; (e) the Clean Water Act, 33 U.S.C. §§1251 et seq.; (f) the Clean Air Act, 42 <br />U.S.C. §§7401 et seq.; and (g) any other federal, state, or local statute, law, rule, <br />regulation, ordinance, resolution, code, order, or decree regulating, relating to, or <br />imposing liability or standards of conduct concerning, any hazardous, toxic, or <br />dangerous waste, substance, or material. <br />8.Consultants – Individuals or entities having a contract with Engineer to furnish services <br />with respect to this Project as Engineer’s independent professional associates and <br />consultants; subcontractors; or vendors. <br />9.Contract Documents – Those items so designated in the Construction Contract, <br />including the Drawings, Specifications, construction agreement, and general and <br />supplementary conditions. Only printed or hard copies of the items listed in the <br />Construction Contract are Contract Documents. Approved Shop Drawings, other <br />Contractor submittals, and the reports and drawings of subsurface and physical <br />conditions are not Contract Documents. <br />10.Contractor – The entity or individual with which Owner has entered into a Construction <br />Contract. <br />11.Documents – Data, reports, Drawings, Specifications, Record Drawings, and other <br />deliverables, whether in printed or electronic media format, provided or furnished in <br />appropriate phases by Engineer to Owner pursuant to this Agreement. <br />12.Drawings – That part of the Contract Documents prepared or approved by Engineer <br />which graphically shows the scope, extent, and character of the Work to be performed <br />by Contractor. Shop Drawings are not Drawings as so defined. <br />13.Effective Date – The date indicated in this Agreement on which it becomes effective, but <br />if no such date is indicated, the date on which this Agreement is signed and delivered by <br />the last of the parties to sign and deliver.