Laserfiche WebLink
Scale 1" = 1,000'PROJECTDESIGNATIONCONTRACTBRIDGE FILEINDIANA DEPARTMENT OF TRANSPORTATIONSTANDARD SPECIFICATIONS DATED 2022TO BE USED WITH THESE PLANSINDIANA DEPARTMENTOF TRANSPORTATIONSHARED USE PATH PLANSBridge Length:Trail Length (PII):Net Length:Maximum Grade:0.062 MI.0.678 MI.0.740 MI.5.60 %PROJECT LOCATION MAPCITY OF SOUTH BEND THE SCOPE OF THE PROJECT IS THE EXPANSION OF AN URBAN TRAIL ALONG AN ABANDONED RAILROAD CORRIDOR.PHASE II – RIVERSIDE DRIVE TO EAST BANK TRAIL (APPROX. 3,500’)THIS PROJECT IS LOCATED IN SECTIONS 35 AND 36, TOWNSHIP 38 NORTH, RANGE 2 EAST, & IN SECTIONS 1 & 2,TOWNSHIP 37 NORTH, RANGE 2 EAST, , PORTAGE TOWNSHIP, CITY OF SOUTH BEND, ST. JOSEPH COUNTY, INDIANA.T 38 NT 37 NP.O.T. 42+42.15 "PR-CLT 2"End Project 1401811WILBER ST.DIAMOND AVE.W. ANGELA BLVD.LINCOLN WAY W.PORTAGE AVE.N. MICHIGAN ST.36353412T 38 NT 37 N86°15'47" WLATITUDE:41°41'38" NLONGITUDE:PROJECT LOCATION SHOWN BY3PHASE IIKIN DESIGNATION NUMBERSROADWAYRIVERSIDE DR.P.O.T.10+00.00 "PR-CLT 2"Begin Project 14018111401811Coal Line Trail Phase IIBRIDGEBridge Over St. Joseph RiverPROJECT NO. 1401811 (PHASE II) P.E., R/W1401811KYLE W. SILVEUS, P.E.TOY VILLAJORDAN V. GATHERSJOSEPH R. MOLNARANNE FUCHSMURRAY L. MILLERCITY OF SOUTH BENDAPPROVED BY BOARD OF PUBLIC WORKSDATECITY ENGINEERCONSTRUCTIONAPPROVED BY CITY STAFFDATEPRESIDENTMEMBERMEMBERMEMBERCLERKMEMBERELIZABETH A. MARADIKKARA M. BOYLES, Ph.D., P.E.ADMINISTRATION & DESIGN (ERC)14 Digit HUC: 04050001240040GARY A. GILOTFile Name: p:\RD\C3D\16-406\Road\Dwg\Plans Phase 2\CLT2 - Title Sheet.dwg Plot Date: 9/15/2021 Plotted By: Clifton FergusonINDIANA DEPARTMENT OF TRANSPORTATIONDATEPHONE NUMBERFOR LETTING:APPROVEDCERTIFIED BY:PREPARED BY:PLANS8440 Allison Pointe Blvd.Suite 200Indianapolis, IN 46250Phone 317-895-2585www.ucindy.comSHEETSofCONTRACTBRIDGE FILEPROJECTDESIGNATIONSURVEY BOOK-1401811-R-380651541401811R-38065PART 1 OF 21401811R-380651401811DATEKYLE WE WE WE WE W. SILVEUS, P.E.9/17/2109/17/20219/17/2021September 28, 2021