Laserfiche WebLink
BID TABULATION <br />SOUTH BEND 2021 DRAINAGE IMPROVEMENTS - KALEY ST MARION ST <br />Project No: 121-006AKALEY ST & MARION ST DRAINAGE IMPROVEMENTS 2021 <br />DIVISION 2 - MARION STREET IMPROVEMENTS <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost <br />22 CONSTRUCTION ENGINEERING 1 LSUM $1,500.00 $1,500.00 $3,445.25 $3,445.25 $6,500.00 $6,500.00 $3,000.00 $3,000.00 <br />23 MOBILIZATION AND DEMOBILIZATION 1 LSUM $6,769.35 $6,769.35 $16,400.00 $16,400.00 $6,820.00 $6,820.00 $22,900.00 $22,900.00 <br />24 MAINTENANCE OF TRAFFIC 1 LSUM $7,500.00 $7,500.00 $8,300.00 $8,300.00 $7,160.00 $7,160.00 $9,500.00 $9,500.00 <br />25 VIDEO RECORD 1 LSUM $1,500.00 $1,500.00 $600.00 $600.00 $500.00 $500.00 $1,000.00 $1,000.00 <br />26 CLEARING OF RIGHT-OF-WAY 1 LSUM $3,000.00 $3,000.00 $9,500.00 $9,500.00 $28,600.00 $28,600.00 $1,500.00 $1,500.00 <br />27 TREE REMOVE 3 EACH $2,000.00 $6,000.00 $850.00 $2,550.00 $1,500.00 $4,500.00 $900.00 $2,700.00 <br />28 CONCRETE, PAVEMENT REMOVE 40 SYS $40.00 $1,600.00 $36.00 $1,440.00 $25.00 $1,000.00 $35.00 $1,400.00 <br />29 CONCRETE CURB REMOVE 176 LFT $16.00 $2,816.00 $14.00 $2,464.00 $10.00 $1,760.00 $10.00 $1,760.00 <br />30 SURFACE MILLING, ASPHALT 1.5 IN 4900 SFT $3.00 $14,700.00 $1.90 $9,310.00 $1.60 $7,840.00 $1.25 $6,125.00 <br />31 CLEAR AND GRUB 360 SFT $2.00 $720.00 $13.00 $4,680.00 $5.00 $1,800.00 $2.00 $720.00 <br />32 COMMON EXCAVATION, ASPHALT REMOVE 170 CYS $50.00 $8,500.00 $64.00 $10,880.00 $17.00 $2,890.00 $55.00 $9,350.00 <br />33 STRUCTURAL BACKFILL 75 CYS $45.00 $3,375.00 $0.01 $0.75 $16.00 $1,200.00 $15.00 $1,125.00 <br />34 HMA BASE, TYPE B, 8"75 TON $125.00 $9,375.00 $150.00 $11,250.00 $143.00 $10,725.00 $143.00 $10,725.00 <br />35 HMA INTERMEDIATE, TYPE B, 2.5"25 TON $100.00 $2,500.00 $210.00 $5,250.00 $256.00 $6,400.00 $256.00 $6,400.00 <br />36 HMA SURFACE, TYPE B, 1.5"60 TON $130.00 $7,800.00 $175.00 $10,500.00 $200.00 $12,000.00 $200.00 $12,000.00 <br />37 COMPACTED AGGREGATE , No. 53 25 CYS $75.00 $1,875.00 $60.00 $1,500.00 $100.00 $2,500.00 $225.00 $5,625.00 <br />38 PCCP FOR APPROACH, REINFORCED 40 SYS $100.00 $4,000.00 $255.00 $10,200.00 $192.00 $7,680.00 $300.00 $12,000.00 <br />39 SIDEWALK, CONCRETE, 4 IN 2 SYS $63.00 $126.00 $700.00 $1,400.00 $175.00 $350.00 $870.00 $1,740.00 <br />40 CURB RAMP, CONCRETE 6 SYS $100.00 $600.00 $400.00 $2,400.00 $420.00 $2,520.00 $310.00 $1,860.00 <br />41 CONCRETE CURB 190 LFT $75.00 $14,250.00 $70.00 $13,300.00 $48.00 $9,120.00 $31.00 $5,890.00 <br />42 CURB INLET 4 EACH $3,000.00 $12,000.00 $4,700.00 $18,800.00 $2,480.00 $9,920.00 $4,200.00 $16,800.00 <br />43 CORE & BOOT EXIST STORM STRUCTURE 1 EACH $2,000.00 $2,000.00 $4,700.00 $4,700.00 $1,175.00 $1,175.00 $3,000.00 $3,000.00 <br />44 PVC STORM SEWER PIPE, 12IN 180 LFT $75.00 $13,500.00 $52.00 $9,360.00 $66.00 $11,880.00 $85.00 $15,300.00 <br />45 RCP STORM SEWER PIPE, 12IN 95 LFT $75.00 $7,125.00 $59.00 $5,605.00 $66.00 $6,270.00 $95.00 $9,025.00 <br />46 HYDROMULCH, SEEDING AND TOPSOIL 50 SYS $12.00 $600.00 $100.00 $5,000.00 $45.75 $2,287.50 $75.00 $3,750.00 <br />47 OVERSTORY TREE, 2-1/2" CAL 2 EACH $600.00 $1,200.00 $1,155.00 $2,310.00 $1,343.00 $2,686.00 $1,155.00 $2,310.00 <br />48 TREE WATER BAG 2 EACH $200.00 $400.00 $80.00 $160.00 $80.00 $160.00 $80.00 $160.00 <br />49 THERMOPLASTIC LINE, SOLID, WHITE, 4 IN 185 LFT $2.00 $370.00 $3.00 $555.00 $1.25 $231.25 $10.00 $1,850.00 <br />50 THERMOPLASTIC LINE, SOLID, YELLOW, 4 IN 420 LFT $2.00 $840.00 $3.00 $1,260.00 $1.25 $525.00 $10.00 $4,200.00 <br />51 THERMOPLASTIC LINE, SOLID, WHITE, 8 IN 40 LFT $3.00 $120.00 $5.00 $200.00 $1.85 $74.00 $15.00 $600.00 <br />52 THERMOPLASTIC LINE, SOLID, WHITE 24 IN 20 LFT $6.00 $120.00 $15.00 $300.00 $7.95 $159.00 $20.00 $400.00 <br />53 TEMPORARY EROSION CONTROL MEASURES 1 LSUM $5,000.00 $5,000.00 $300.00 $300.00 $1,400.00 $1,400.00 $750.00 $750.00 <br />$141,781.35 $173,920.00 $158,632.75 $175,465.00 <br />I hereby certify that the above truly and accurately represents bids received for this project on August 25, 2021 <br />Chris Chockley, PLA <br />Name, Title <br />YESYESNon-Collusion Affadavit -YES <br />Division 2 Total <br />Engineer's Estimate Milestone Contractors North Selge Construction HRP Construction <br />H:\2021 Projects\2021-0028\Bidding\2021-08-24 Bid Tabulation.xlsx