My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - City of SB 2021 Drainage Improvements - Kaley St. & Marion St. Proj No. 121-006A - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Award Bids
>
Award Bid - City of SB 2021 Drainage Improvements - Kaley St. & Marion St. Proj No. 121-006A - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 3:41:03 PM
Creation date
9/28/2021 3:40:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/28/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br /> <br /> <br />TO: Anne Fuchs, Clerk <br />Board of Public Works <br />FROM: Rebecca Plantz, Project Engineer <br />SUBJECT: Award Project No. 121-006A <br />South Bend 2021 Drainage Improvements – Kaley & Marion <br />DATE: September 20, 2021 <br />On August 24, 2021, the Board of Public Works opened and read bids for the above project. <br /> <br />The bids are summarized as follows: <br /> <br />Bidder Division 1 <br />Base Bid <br />Division 1 <br />Alternate Division 2 <br />Total of Div 1, <br />Div 1 Alt, & <br />Div 2 <br />Selge Construction <br />Co., Inc. $84,211.50 $10,160.00 $158,632.75 $253,004.25 <br />HRP Construction <br />Inc. $82,425.00 $9,250.00 $175,465.00 $267,140.00 <br />Milestone <br />Contractors North, <br />Inc. <br />$94,280.00 $9,170.00 $173,920.00 $277,370.00 <br /> <br />Division 1 <br />MBE Goal: 3.2% <br />WBE Goal: 5.4% <br /> <br />Division 2 <br />MBE Goal: 2.7% <br />WBE Goal: 5.1% <br /> <br />The project is funded by Stormwater Infrastructure – Sewers in the interest of drainage <br />improvements to Kaley Street and Marion Street including curb, stormwater swales, pavement, <br />storm structures, and storm pipe. Sufficient funding is available for the following <br />recommendations: <br /> <br />Division 1 – Kaley St, I recommend rejection of the lowest bid from HRP Construction, Inc. <br />based on the conclusions of Legal and the Office of Diversity and Inclusion that HRP failed to <br />meet the MBE participation goal of 3.2% and did not meet the good faith efforts standards to <br />obtain MBE participation. <br /> <br />On Form MBE – 1.0 MBE Utilization Plan, HRP listed an MBE participation percentage of 0.9%. <br />which does not meet the 3.2% MBE goal. In light of HRP’s inability to meet the MBE goal on <br />
The URL can be used to link to this page
Your browser does not support the video tag.