Laserfiche WebLink
167 <br /> <br />REGULAR MEETING SEPTEMBER 14, 2021 <br />The Regular Meeting of the Board of Public Works was convened at 9:30 a.m. on Tuesday, <br />September 14, 2021, by Board President Elizabeth A. Maradik in the 13th Floor Conference <br />Room of the County-City Building, 227 W. Jefferson Blvd., South Bend, Indiana. The meeting <br />was also streamed live to the public via Microsoft Teams. Board Clerk Anne Fuchs confirmed <br />the presence of Board Members Elizabeth A. Maradik, Gary Gilot, Jordan Gathers, Joseph <br />Molnar, Murray Miller, and Board Attorney Clara McDaniels, with a roll call. Mr. Molnar and <br />Attorney McDaniels attended virtually. Ms. Maradik reminded virtual attendees to mute their <br />microphones and turn off their cameras when not speaking, and to save their questions and <br />comments for the Privilege of the Floor. <br /> <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by Mr. Molnar, seconded by Mr. Gathers and carried by roll call, the <br />minutes of the Regular Meeting of the Board held on August 24, 2021, were approved. <br /> <br />OPENING OF QUOTATIONS – CSO 18 BACKWATER VALVE REPLACEMENT – <br />PROJECT NO. 120-017 (PR-00010974) <br />Ms. Maradik advised that this was the date set for the receiving and opening of sealed quotations <br />for the above referenced project. The following quotations were opened and read: <br /> <br /> HRP CONSTRUCTION INC. <br />5777 Cleveland Rd., PO Box 266 <br />South Bend, IN 46624-0266 <br />cindyv@hrpconstruction.com; mattc@hrpconstruction.com <br />Quotation was submitted by Mr. Matthew D. Cain <br /> Non-Collusion, Non-Discrimination Affidavit Form was completed. <br /> Five percent (5%) Bid Bond was submitted. <br /> Form MWBE-2.0 Evidence of Good Faith Efforts was completed. <br /> <br /> QUOTATION: $148,000.00 <br /> <br />SELGE CONSTRUCTION CO., INC. <br />2833 South 11TH St. <br />Niles, MI 49120 <br />aswinehart@selgeconstruction.com <br /> Bid was signed by Mr. Justin Butler <br />Non-Collusion, Non-Discrimination Affidavit Form was completed. <br /> Five percent (5%) Bid Bond was submitted. <br />Form MWBE-2.0 Evidence of Good Faith Efforts was completed. <br /> <br /> QUOTATION: $124,980.00 <br /> <br /> GRAND RIVER CONSTRUCTION, INC. <br />5025 40th. Ave. <br />Hudsonville, MI 49426 <br /> RParcheta@grandriverconstruction.com <br />Quotation was submitted by Mr. Richard Parcheta <br /> Non-Collusion, Non-Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br /> Form MWBE-2.0 Evidence of Good Faith Efforts was completed. <br /> <br /> QUOTATION: $164,500.00 <br /> <br />Upon a motion made by Mr. Molnar, seconded by Mr. Gathers and carried by roll call, the above <br />quotations were referred to Engineering for review and recommendation. <br /> <br />OPENING OF QUOTATIONS – 2021 SPEED RADAR SIGN INSTALLATION – PROJECT <br />NO. 121-062 (PR-00011636) <br />Ms. Maradik advised that this was the date set for the receiving and opening of sealed quotations <br />for the above referenced project. The following quotations were opened and read: <br /> <br />