My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4. Norfolk Southern Rail Road Bridge_COA 2021-0902
sbend
>
Public
>
Historic Preservation
>
2021
>
September
>
4. Norfolk Southern Rail Road Bridge_COA 2021-0902
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2021 4:37:18 PM
Creation date
9/15/2021 4:35:45 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
Norfolk Southern Railroad Bridge
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DESIGNED: <br />CHECKED: <br />DRAWN: <br />CHECKED: <br />RECOMMENDED <br />FOR APPROVAL <br />DESIGN ENGINEER DATE <br />SHEETS <br />of <br />VERTICAL SCALE <br />HORIZONTAL SCALE <br />CONTRACT <br />BRIDGE FILE <br />PROJECT <br />DESIGNATION <br />SURVEY BOOKCJDDJZ <br />BSF CJD <br />AS NOTED <br />AS NOTED <br />- <br />1401811 <br />- <br />R-38065 <br />38 39 <br />1401811 <br />SCREED TABLE <br />COAL LINE TRAIL OVER ST. JOSEPH RIVER <br />INDIANA <br />DEPARTMENT OF TRANSPORTATION <br />File Name: P:\RD\C3D\16-406\Bridge\Dwg\Plans\Screeds.dwg Plot Date: 7/23/2021 Plotted By: David Zola8440 Allison Pointe Boulevard, Suite 200 <br />Indianapolis, IN 46250 <br />Phone 317-895-2585 <br />www.ucindy.comConsulting <br />UNITED <br /> NOTES: <br /> For Additional Screed Details, See Sheets 36 & 37. <br /> PROCEDURE AND NOTES: <br />After the beams are set and prior to setting the deck forms, <br />take elevations at all screed points on top of the beams. Enter <br />these elevations in the table. Subtract these elevations from <br />the tabulated elevations and use the resulting dimensions as <br />the height for setting screed forms above these points. These <br />dimensions remain constant regardless of how much or in <br />what order the concrete is poured. <br />DO NOT SET SCREED FORMS BY LEVELING. <br />Formwork for the floor slab shall not be set until the above <br />operations are completed and are to be approved by the <br />ENGINEER. <br />Screed elevations as shown in the table are calculated based <br />on a deadload deflection of zero. <br />1. <br />2. <br />3. <br />4.
The URL can be used to link to this page
Your browser does not support the video tag.