My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to Preliminary ESA - Addtl. Design Srvcs. RR Signal Relocation Olive St. – Norfolk-Southern Railway Company
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to Preliminary ESA - Addtl. Design Srvcs. RR Signal Relocation Olive St. – Norfolk-Southern Railway Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:13:52 PM
Creation date
9/14/2021 3:13:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ITEM F - Signal & Electrical Changes <br />(see attached summary) <br />Material:0 <br />Labor:5,000 <br />Purchase Services:20,000 <br />Other:0 <br />NET TOTAL - ITEM F 25,000$ <br />ITEM G - Track Work <br />Material:(see attached summary)0 <br />Labor:(see attached summary)0 <br />Additive:(see attached summary)0 <br />Purchase Services:(see attached summary)0 <br />D&C (Lump Sum):(see attached summary)0 <br />NET TOTAL - ITEM G -$ <br />ITEM H - T-CUBED <br />Lump Sum (see attached summary)-$ <br />NOTES <br />1. For all groups of CONTRACT employees, the composite labor <br />surcharge rate used in this estimate (including insurance) <br />is 185.81%. Self Insurance - Public Liability Property <br />Damage is estimated at 16.00%. Work will be billed at <br />actual current audited rate in effect at the time the <br />services are performed. <br />2. For all groups of NON-CONTRACT employees, the composite <br />labor surcharge rate used in this estimate (including <br />insurance is 78.59%. Self Insurance - Public Liability <br />Property Damage is estimated at 16.00%. Work will be <br />billed at actual current audited rate in effect at the <br />time the services are performed. <br />3.All applicable salvage items due the Department will be <br />made available to it at the jobsite for its disposal. <br />4. The Force Account Estimate is valid for one (1) year <br />after the date of the estimate (08/11/2021). If the work is <br />not performed within this time frame the Railway may <br />revise the estimate to (1) include work not previously <br />indicated as necessary and (2) reflect changes in cost <br />to perform the force account work.
The URL can be used to link to this page
Your browser does not support the video tag.