My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 12 - Bendix Dr., Lathrop to Indiana Toll Road – Proj No. 114-065 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Change Orders
>
Change Order No 12 - Bendix Dr., Lathrop to Indiana Toll Road – Proj No. 114-065 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:10:08 PM
Creation date
9/14/2021 3:10:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -37497 INDIANA Date:07/14/2021 <br />Change Order No:012 Department of Transportation Page: 4 <br />Supplemental Description2: <br />Total Value for Change Order 012 = $ 9,604.74 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />This Change Order was requested by the City of South Bend to address complaints from the public. The city requested a redesign of the <br />pavement markings already placed on Bendix southbound at Nimtz Parkway and Bendix northbound at Lathrop. Existing Pavement Markings will <br />removed and replaced in the new configuration as shown on the plan adendum. Existing line Items will be used. Additional Mobilization charges <br />will be added as this change was requested at the Prefinal Inspection. No additional time will be added to the final completion date. <br />Change Order Explanation for Specific Line Item <br />**************************************************************************************************************************** <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:____________________________________________ Signed By:_____________________________________________ <br />Date:__________________________________________________ <br />*************************************************************************************************************************** <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />Rieth Riley Construction Co., Inc. <br />7/16/21
The URL can be used to link to this page
Your browser does not support the video tag.