Laserfiche WebLink
6 City of South Bend| Inspection of Olive Street Phase 2 Road Improvements at RR Xing | R-43125 | Des. #1920178 <br />USI has the expertise to provide innovative solutions to any unique construction management and inspection project. We look at innovative approaches and the best possible way to <br />serve the public safely and efficiently, while doing so in the most cost-effective manner. Relevant to this RFP, USI has overseen the construction of other similar projects across Indiana. <br />Project Experience <br />This $1.17 million intersection improvement project was located at the intersection of Johnson Rd and <br />CR 400N within LaPorte County (R-35966). This project added turn lanes on both Johnson Road and CR <br />400N. Elements of this project included new storm sewer, new strain poles, new signals, new HMA, <br />new pavement markings, new signs and four added turn lanes. The added turn lanes were needed <br />due to the increased traffic on both roads. The turn arrows help to facilitate a safer turning movement <br />for the traveling public. The project ran into numerous utility conflict and some constructability <br />conflicts, but was still completed on time and under budget. Work was performed for LaPorte County <br />in conjunction with the Indiana Department of Transportation. Mr. Sherman’s responsibilities as the <br />project supervisor included inspecting and reporting quantities for all the contractor’s work throughout <br />the jobsite and documenting all events, visitors, and happenings. He also completed SiteManager <br />entries, including daily reports, completed material tests and entered material record information. He <br />also completed the Final Construction Record on time with minimal checks.Pre-ConstructionPre-Construction <br />Johnson Road and CR 400N Intersection Improvement <br />Construction Services Project Manager: Justin Sherman <br />Olive Street Reconstruction, Phase I – from Prairie Avenue to Tucker Drive <br />Assistant Project Supervisors: Justin Sherman and Mark Whitten <br />This $3.34 million intersection improvement project is located at on Olive Street between Prairie <br />Avenue (SR 23) and Indiana Court, within the City of South Bend (R-37495). This project added a <br />multi-use path and created a center turn lane. Elements of this project included the addition of a new <br />multi-use path, 5,000 lft of new storm sewer pipe with various types of storm drain structures, new <br />lighting, 15,600 sys of new 10” PCCP, 1,500 sys of new drive approaches, 7,600 lft of new pavement <br />markings, added parking lanes, and a new center turn lane. The added center turn lane was needed <br />due to the large amount of commercial traffic turning into the various commercial properties. The <br />project ran into numerous utility conflicts and some constructability conflicts, but were worked <br />through with the contractor, the designer, and the City. Work was performed for the City of South <br />Bend in conjunction with the Indiana Department of Transportation.