My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 120-017 CSO 18 Backwater Valve Replacement Proj No. 120-017 - HRP Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Quotes - 120-017 CSO 18 Backwater Valve Replacement Proj No. 120-017 - HRP Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:51:48 PM
Creation date
9/14/2021 2:49:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Numbe <br />Bidder: I <br />CITY OF SOUTH BEND <br />MINORITY AND WOMEN BUSINESS ENTERPRISE INCLUSION PROGRAM PLAN <br />FORM MWBE-1.0 M5 <br />MWBE UTILIZATION PLAN <br />al <br />My 7=0 0 IMM <br />MUM Mm <br />120-017 Project Name: CSO 18 Backwater Valve Replacement <br />HRP CONSTRUCTION INC. Total Bid Amount $1489000.00 BE Goal: - 4.29% <br />Page 1 of 1 <br />Name & Address of WBE <br />Primary Contact Person <br />(Name/Telephone) <br />Scope of Work to be Performed <br />(Attach scope/schedule if you need additional space) <br />Dollar Amount of WBE <br />Component <br />Percentage <br />of Total <br />Bid/Proposal <br />BUC Construction Supply DBE <br />Supplier <br />P.O. Box 4153 <br />Lafayette, IN 47903 <br />Pat Butler <br />(765) 412-3484 <br />Structures <br />$359997.00 <br />24-32 <br />iflatthew D. Cain, President <br />Print Name <br />'tignature NO - <br />Version 01 /13/2021 Contractor's Bid for Public Works - 9 <br />September 14, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.