My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 120-017 CSO 18 Backwater Valve Replacement Proj No. 120-017 - Grand River Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Quotes - 120-017 CSO 18 Backwater Valve Replacement Proj No. 120-017 - Grand River Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:49:25 PM
Creation date
9/14/2021 2:49:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />5025 40th Avenue, Hudsonville, MI 49426 <br />Phone: 616-669-5611 <br />www.grandriverconstruction.com <br />Fax: 616-669-3466 <br /> <br />Grand River Construction, Inc. <br />General Contractors • Commercial and Industrial • Concrete Specialist <br /> <br /> <br />City of South Bend, Indiana <br />Contractor’s Bid for Public Work <br />CSO 18 Backwater Valve Replacement <br />Project No. 120-017 <br />September 14, 2021 <br /> <br />Section I Experience Questionnaire <br /> <br />1. Projects completed for the period of one year prior to the date of the current bid: <br />a. See Attached List. <br /> <br />2. Public works currently under construction: <br />a. See Attached List <br /> <br />3. Failure to complete work awarded: <br />a. None <br /> <br />4. References: <br />a. Tetra Tech, Lansing, MI, Pete Daukss, (517) 316-3930 <br />b. Moore & Bruggink, Inc., Brian Hannon, Grand Rapids MI. (616) 363-9801 <br />c. Wade Trim, Taylor MI., Dave Nummer, (734) 947-2793 <br />d. City of Elkhart Department of Public Works, Michael Machlan, (574) 293-2572 <br /> <br />Section II Plan and Equipment Questionnaire <br /> <br />1. Project execution plan: <br />a. Once the notice to proceed is delivered and signed, GRC can start the submittal <br />process for the materials used in the project and permit application. The actual <br />start of the project would depend on the submittal approval time and fabrication <br />and delivery to site of reinforcing steel and the flexible flap gate. Currently the <br />flap gate submittal is 2-3 weeks, and the flap gate procurement is 12-14 weeks. <br />b. Once the materials are delivered on site GRC can start with the isolation of the <br />structure and removal of the existing structure lid, backwater valve and backing <br />plate. <br />c. GRC will continue with the installation of the new coplastix flanged frame, <br />flexible flap valve and new structure lid, followed by the leakage testing of the <br />new equipment. <br />d. Due to the size of the project GRC anticipates a crew of 3-4 workers on site.
The URL can be used to link to this page
Your browser does not support the video tag.