Laserfiche WebLink
QUOTE TABULATION <br />Laurel Woods Maintenance Project <br />Project No: 121-007R <br />For Quotes Due: 8/10/2021 <br />Item No. Description Quantity Unit Unit Price Item Total <br />1 Mobilization & Demobilization 1 LS 5,400.00$ 5,400.00$ <br />2 Clearing and Grubbing 1 LS 15,000.00$ 15,000.00$ <br />3 Excavation, Unclassified 1 LS 65,500.00$ 65,500.00$ <br />4 Temporary Construction Entrance, No. 2 Stone 50 TON 30.00$ 1,500.00$ <br />5 Erosion Control Blanket 650 SYS 2.60$ 1,690.00$ <br />6 Fence, Chain Link, Reset 30 LFT 85.00$ 2,550.00$ <br />7 Seed Mixture, Type U 650 SYS 1.20$ 780.00$ <br />8 Topsoil 110 CYS 25.00$ 2,750.00$ <br />9 Casting, Replace 1 EACH 750.00$ 750.00$ <br />10 Clean Storm Sewer, 12"-24" Dia. 760 LFT 11.25$ 8,550.00$ <br />11 Televise Sewer, 12"-24" Dia. 760 LFT 2.20$ 1,672.00$ <br />12 Construction Dewatering 1 LS 15,000.00$ 15,000.00$ <br />13 Maintenance of Traffic 1 LS 4,000.00$ 4,000.00$ <br />Total 125,142.00$ <br />I hereby certify that the above truly and accurately represents quotes received for this project on DATE <br />Becca Plantz, Project Engineer <br />Non-Collusion Affadavit Y <br />Selge Construction Co,, Inc. <br />Page 1 of 1