Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BENDYS�,ti�,,��� <br />PROJECT NAME: 2021 Drainage Improvements - Kaley St & Marion St <br />PROJECT NO. 120-006A,`^�, <br />FOR BIDS DUE: August 24, <br />2021 <br />CONTRACTOR NAME: Milestone Contractors North, Inc. <br />DIVISION 2 - MARION STREET IMPROVEMENTS <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />22 <br />CONSTRUCTION ENGINEERING <br />1 <br />LSUM <br />3445.25 <br />$3,445.25 <br />23 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LSUM <br />16400.00 <br />$16,400.00 <br />24 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LSUM <br />8300.00 <br />$8,300.00 <br />25 <br />VIDEO RECORD <br />1 <br />LSUM <br />600.00 <br />$600.00 <br />26 <br />CLEARING OF RIGHT-OF-WAY <br />1 <br />LSUM <br />9500.00 <br />$9,500.00 <br />27 <br />TREE REMOVE <br />3 <br />EACH <br />850.00 <br />$2,550.00 <br />28 <br />CONCRETE, PAVEMENT REMOVE <br />40 <br />SYS <br />36.00 <br />$1,440.00 <br />29 <br />CONCRETE CURB REMOVE <br />176 <br />LFT <br />14.00 <br />$2,464.00 <br />30 <br />SURFACE MILLING, ASPHALT 1.5 IN <br />4900 <br />SFT <br />1.90 <br />$9,310.00 <br />31 <br />CLEAR AND GRUB <br />360 <br />SFT <br />13.00 <br />$4,680.00 <br />32 <br />COMMON EXCAVATION, ASPHALT REMOVE <br />170 <br />CYS <br />64.00 <br />$10,880.00 <br />33 <br />STRUCTURAL BACKFILL <br />75 <br />CYS <br />0.01 <br />$0.75 <br />34 <br />HMA BASE, TYPE B, 8" <br />75 <br />TON <br />150.00 <br />$11,250.00 <br />35 <br />HMA INTERMEDIATE, TYPE B, 2.5" <br />25 <br />TON <br />210.00 <br />$5,250.00 <br />36 <br />HMA SURFACE, TYPE B, 1.5" <br />60 <br />TON <br />175.00 <br />$10,500.00 <br />37 <br />COMPACTED AGGREGATE, No. 53 <br />25 <br />CYS <br />60.00 <br />$1,500.00 <br />38 <br />PCCP FOR APPROACH, REINFORCED <br />40 <br />SYS <br />255.00 <br />$10,200.00 <br />39 <br />SIDEWALK, CONCRETE, 4 IN <br />2 <br />SYS <br />700.00 <br />$1,400.00 <br />40 <br />CURB RAMP, CONCRETE <br />6 <br />SYS <br />400.00 <br />$2,400.00 <br />41 <br />CONCRETE CURB <br />190 <br />LFT <br />70.00 <br />$13,300.00 <br />42 <br />CURB INLET, 24" DIA <br />4 <br />EACH <br />4700.00 <br />$18,800.00 <br />43 <br />CORE & BOOT EXIST STORM STRUCTURE <br />1 <br />EACH <br />4700.00 <br />$4,700.00 <br />44 <br />PVC STORM SEWER PIPE, 121N <br />180 <br />LFT <br />52.00 <br />$9,360.00 <br />45 <br />RCP STORM SEWER PIPE, 121N <br />95 <br />LFT <br />59.00 <br />$5,605.00 <br />46 <br />HYDROMULCH, SEEDING AND TOPSOIL <br />50 <br />SYS <br />100.00 <br />$5,000.00 <br />47 <br />OVERSTORY TREE, 2-1/2" CAL <br />2 <br />EACH <br />1155.00 <br />$2,310.00 <br />48 <br />TREE WATER BAG <br />2 <br />EACH <br />80.00 <br />$160.00 <br />49 <br />THERMOPLASTIC LINE, SOLID WHITE, 4 in. <br />185 <br />LFT <br />3.00 <br />$555.00 <br />50 <br />THERMOPLASTIC LINE, SOLID YELLOW, 4 in. <br />420 <br />LFT <br />3.00 <br />$1,260.00 <br />Version 01/13/2021 Contractor's Bid for Public Works - 8 <br />