Laserfiche WebLink
Exported: 8/23/20218:28:12 AM <br />Sutject: Addendum I Notification from HRP Construction Inc. for Kaley St. and Marion St. 2021 Drainage Improvements <br />Message: <br />ONDECIDED <br />Addendum 1 has been issued for the above -referenced project, which includes reissuance of the entire plan set. Please click above to <br />"View Plans" and to download the addendum. <br />TO: Joe's Plumbing FROM: Tony Bogard <br />Joseph P Lumber tonyb@hrpconstruction.com <br />demo@email.com 574-309-6449 <br />PROJECT NAME: Kaley St. and Marion St. 2021 Drainage Improvements <br />PROJECULOCATION: Kaley Street <br />South Bend, IN 46601 <br />Division 1 Kaley Street- New curb installation along the north side of 2324 Kaley St, construction of a storm water Swale and <br />reconstruction of a driveway approach. <br />Division 2 Marion Street: Removal of existing pavement, curb and storm structure, installation of four new storm inlets and storm pipe, <br />construction of new concrete curb, flatwork, and HMA pavement along Madison St, between William and Lafayette Streets in downtown <br />South Bend. <br />Please send separate quotes for Division 1 and Division 2. <br />To access plans and specs, CLICK HERE <br />-or- <br />go to www.hrpplanroom.com and enter Access Key: DEMOKEY1 23 <br />Submit Quotes by 08123/2021 via email tonyb@hrpconstruction.com. <br />EqOpportunity Employer <br />Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 <br />Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 <br />Note: This message was sent from an Automated Project Messaging System. If you do not wish to receive these emails, please contact the Sender or visit h ttr)s://wvAv.hr1oplan room -com/optou to remove <br />yourself from our system. <br />