My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Replacement Floor Slab on Orchestra Level Proj No. 121-029 – Frost Engineering & Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Replacement Floor Slab on Orchestra Level Proj No. 121-029 – Frost Engineering & Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2021 2:39:23 PM
Creation date
8/10/2021 2:39:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/10/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
121-029 - Morris Performing Arts Center Page 8 of 9 <br /> <br /> <br />Frost Engineering & Consulting Company OUR MISSION IS SIMPLE <br />© Copyright 2005. All rights reserved. BE THE BEST! <br /> <br /> <br />This fee estimate does not include Civil Engineering, Surveying, permitting fees or other structural work <br />related to project except as specifically noted . It is understood by Frost Engineering & Consulting Company <br />that these services are not necessary and/or will be performed by others. <br /> <br />These above Professional Service Costs are for the Professional Engineering Design and Consulting services <br />for Engineering as outlined above. It is understood that the Architect/Contractor /Owner will allow Frost <br />Engineering access to all plans and/or recor ds in its possession and at its disposal pertaining to this work, <br />including all necessary electronic drawings files created in support of the design. <br /> <br />Frost Engineering will provide PDF drawing files of all structural plans upon completion for Project Record <br />purposes of the project however Frost Engineering and Consulting reserves all rights with regards to these <br />files. <br /> <br />All efforts to develop the most efficient systems will be made, however Project cost monitoring is not within <br />the scope of our services unless specifically outlined in the above scope of work . Should redesign of the <br />project be required due to cost overruns, the structural work required due to the redesign will be negotiated <br />as additional services before the work is started. <br /> <br />Payments will be made from invoices billed monthly based on percent complete. All fees shall be paid on a <br />percent complete and submitted for payment with thirty-day (30) payment of invoices anticipated to maintain <br />our fee structure. A 1.5% interest will be applied after 30 days of invoice date. <br /> <br />If additional engineering services are required which are outside of the scope of this agreement, those out of scope <br />services shall be negotiated according to the billing schedule as attached and as updated annually. In the event <br />additional engineering services are required due to mistakes, poor design or incomplete work performed by or <br />provided by the Architect/Contractor, the Architect/Contractor agrees to pay Frost Engineering for additional time <br />incurred according to the billing schedule as attached. <br /> <br />It is understood that this proposal shall remain open through the date shown on page 1. After that date, Frost <br />Engineering and Consulting reserves the right to renegotiate the terms of this proposal.
The URL can be used to link to this page
Your browser does not support the video tag.