BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Dubail Avenue Streetscape
<br />Project Number: 120-009
<br />For Bids Due: August 10, 2021
<br />Contractor Name: HRP CONSTRUCTION INC.
<br />BASE BID
<br />Item
<br />No.
<br />Description
<br />p
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LSUM
<br />41, ow. oo
<br />q I, pdp. Lx.)
<br />2
<br />Mobilization/Demobilization
<br />1
<br />LSUM
<br />110 ,.eats
<br />Q CN),O0
<br />3
<br />Clearing Right -of -Way
<br />1
<br />LSUM
<br />ptS coo. co
<br />ow, oa
<br />4
<br />Curb, Concrete, Remove
<br />3,143
<br />LFT
<br />1,5. 00
<br />�!? 145 00
<br />5
<br />Sidewalk, Concrete, Remove
<br />4,317
<br />SYS
<br />js,.
<br />fgtF -I55.00
<br />6
<br />Inlet, Remove
<br />50
<br />EACH
<br />4400. DD
<br />ccaVO
<br />7
<br />Concrete, Remove
<br />550
<br />SYS
<br />14D,00
<br />UOD• d0
<br />8
<br />Pipe, Remove
<br />1,109
<br />LFT
<br />1!5. as
<br />14p 4? 3Sov
<br />9
<br />Excavation, Common
<br />1,781
<br />CYS
<br />z46.CD
<br />go, IgSco
<br />10
<br />Borrow
<br />590
<br />CYS
<br />40. c
<br />loco co
<br />11
<br />Temporary Erosion Control
<br />1
<br />LSUM
<br />S60.60
<br />(,
<br />12
<br />Temporary Inlet Protection
<br />97
<br />EACH
<br />e
<br />3ayr Dp
<br />at� lop -Do
<br />13
<br />Subgrade Treatment, Type ll
<br />4,110
<br />SYS
<br />`-t DD
<br />14
<br />Structure Backfill, Type 2
<br />593
<br />CYS
<br />*75' pO
<br />14. a5�?
<br />15
<br />Compacted Aggregate No. 53
<br />1,250
<br />TON
<br />44j4, 00
<br />56 .Dd
<br />16
<br />Asphalt for Tack Coat
<br />3,750
<br />SYS
<br />001,5, Dp
<br />17
<br />Sidewalk, Concrete
<br />3,930
<br />SYS
<br />qk 00
<br />19? &o-00
<br />18
<br />Curb Ramp, Concrete
<br />590
<br />SYS
<br />C�� OO
<br />1 1 D DD
<br />19
<br />Detectable Warning Surfaces
<br />73
<br />SYS
<br />&'�, DD
<br />/ (�
<br />20
<br />Concrete Curb, Standard
<br />3,800
<br />LFT
<br />3©, pD
<br />J t� Dpp,Ot�
<br />21
<br />Curb, Turnout
<br />14
<br />EACH
<br />t j.5Dp, qrj
<br />a t cx�o. o0
<br />22
<br />H MA for Approaches, Type B
<br />1,550
<br />TON
<br />Id p©
<br />1CO. 00
<br />23
<br />PCCP for Approaches, 8 in.
<br />560
<br />SYS
<br />130. Dd
<br />Ig,66
<br />24
<br />PCCP for Approaches, 6 in.
<br />295
<br />SYS
<br />lckO. DD
<br />35400. co
<br />25
<br />PCCP, Reinforced, Colored
<br />37
<br />SYS
<br />ji .DO
<br />G, g10,UD
<br />26
<br />Sodding, Nursery
<br />5,700
<br />SYS
<br />0
<br />13 ( 1 wap
<br />27
<br />Plantings
<br />108
<br />EACH
<br />0, DD
<br />_�D aq0. 00
<br />28
<br />Pipe, Type 2, Circular, 12 in.
<br />511
<br />LFT
<br />(ps, oc)
<br />is 0o
<br />Version 01/13/2021 Contractor's Bid for Public Works - 8
<br />I
<br />
|