Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Dubail Avenue Streetscape <br />Project Number: 120-009 <br />For Bids Due: August 10, 2021 <br />Contractor Name: HRP CONSTRUCTION INC. <br />BASE BID <br />Item <br />No. <br />Description <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LSUM <br />41, ow. oo <br />q I, pdp. Lx.) <br />2 <br />Mobilization/Demobilization <br />1 <br />LSUM <br />110 ,.eats <br />Q CN),O0 <br />3 <br />Clearing Right -of -Way <br />1 <br />LSUM <br />ptS coo. co <br />ow, oa <br />4 <br />Curb, Concrete, Remove <br />3,143 <br />LFT <br />1,5. 00 <br />�!? 145 00 <br />5 <br />Sidewalk, Concrete, Remove <br />4,317 <br />SYS <br />js,. <br />fgtF -I55.00 <br />6 <br />Inlet, Remove <br />50 <br />EACH <br />4400. DD <br />ccaVO <br />7 <br />Concrete, Remove <br />550 <br />SYS <br />14D,00 <br />UOD• d0 <br />8 <br />Pipe, Remove <br />1,109 <br />LFT <br />1!5. as <br />14p 4? 3Sov <br />9 <br />Excavation, Common <br />1,781 <br />CYS <br />z46.CD <br />go, IgSco <br />10 <br />Borrow <br />590 <br />CYS <br />40. c <br />loco co <br />11 <br />Temporary Erosion Control <br />1 <br />LSUM <br />S60.60 <br />(, <br />12 <br />Temporary Inlet Protection <br />97 <br />EACH <br />e <br />3ayr Dp <br />at� lop -Do <br />13 <br />Subgrade Treatment, Type ll <br />4,110 <br />SYS <br />`-t DD <br />14 <br />Structure Backfill, Type 2 <br />593 <br />CYS <br />*75' pO <br />14. a5�? <br />15 <br />Compacted Aggregate No. 53 <br />1,250 <br />TON <br />44j4, 00 <br />56 .Dd <br />16 <br />Asphalt for Tack Coat <br />3,750 <br />SYS <br />001,5, Dp <br />17 <br />Sidewalk, Concrete <br />3,930 <br />SYS <br />qk 00 <br />19? &o-00 <br />18 <br />Curb Ramp, Concrete <br />590 <br />SYS <br />C�� OO <br />1 1 D DD <br />19 <br />Detectable Warning Surfaces <br />73 <br />SYS <br />&'�, DD <br />/ (� <br />20 <br />Concrete Curb, Standard <br />3,800 <br />LFT <br />3©, pD <br />J t� Dpp,Ot� <br />21 <br />Curb, Turnout <br />14 <br />EACH <br />t j.5Dp, qrj <br />a t cx�o. o0 <br />22 <br />H MA for Approaches, Type B <br />1,550 <br />TON <br />Id p© <br />1CO. 00 <br />23 <br />PCCP for Approaches, 8 in. <br />560 <br />SYS <br />130. Dd <br />Ig,66 <br />24 <br />PCCP for Approaches, 6 in. <br />295 <br />SYS <br />lckO. DD <br />35400. co <br />25 <br />PCCP, Reinforced, Colored <br />37 <br />SYS <br />ji .DO <br />G, g10,UD <br />26 <br />Sodding, Nursery <br />5,700 <br />SYS <br />0 <br />13 ( 1 wap <br />27 <br />Plantings <br />108 <br />EACH <br />0, DD <br />_�D aq0. 00 <br />28 <br />Pipe, Type 2, Circular, 12 in. <br />511 <br />LFT <br />(ps, oc) <br />is 0o <br />Version 01/13/2021 Contractor's Bid for Public Works - 8 <br />I <br />