My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-03-02 Personnel & Finance
sbend
>
Public
>
Common Council
>
Minutes
>
Committee Meeting Minutes
>
2002
>
09-03-02 Personnel & Finance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2013 3:49:50 PM
Creation date
1/3/2013 3:49:37 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Committee Mtg Minutes
City Counci - Date
9/3/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Personnel and Finance Committee <br /> September 3, 2002 <br /> Page 3 <br /> MSF Building Maintenance 2002 Expenditures$ 749,905 <br /> General Fund # 101-0606 2003 Expenditures$ 760,965 <br /> Sam Hensley made the presentation. He noted that there is an increase in personnel costs for on <br /> call duty which is 24/7. A $0.70 increase per hour has been included. <br /> They are currently going through a punch list, but will be moving into the new building soon. <br /> Council Member Kirsits inquired when the open house would be. Mr. Hensley stated that it <br /> should be in late September and will be in conjunction with City on Display. <br /> In response to a question from Dr. Varner, Mr. Hensley noted that the title for the building will be <br /> the Public Works Service Center. The proposed budget is for both buildings. <br /> Traffic & Lighting Division 2002 Expenditures$ 0 <br /> General Fund # 101-0607 2003 Expenditures$2,678,744 <br /> Mr. Hensley noted that one(1) hourly position has been eliminated. $3,000 has been added to the <br /> overtime budget to cover the extra time spent on special events such as Sunburst, Notre Dame <br /> football, etc. <br /> Mr. Gilot noted that the city is continuing to experiment with plastic coatings for street markings. <br /> They are trying to get MACOG to buy in bulk for such LED's and are looking at other new <br /> technologies which will last from 7-10 years. <br /> Motor Vehicle Highway Division 2002 Expenditures$ 3,402,990 <br /> Fund # 202 2003 Expenditures$ 3,769,013 <br /> Mr. Hensley stated that four (4) employees have been eliminated through attrition. 10-13 heavy <br /> equipment operators have been upgraded. <br /> Mr. Hensley noted that they now have one (1) pot hole patcher which cost $ 150,000. It is <br /> designed to be a one-person operation with a permanent plug for pot holes. He noted that it should <br /> be more efficient than the county's pull behind unit which requires three (3) employees. It can be <br /> operational between April and the next January. <br /> Council President Kelly inquired whether the department has enough equipment for their pot hole <br /> patching operations. Mr. Hensley stated that major arterials are addressed first and cold patch <br /> materials will be used in the winter months. He noted that the city should see a difference by <br /> 2003. <br /> Mr. Hensley also noted that in 1981 a bomag machine was purchased. It was recently used on Hill <br /> and Niles and also at Washington and Colfax and suggested that the Council look at the results at <br /> those locations. Sixty-seven (67) blocks have been addressed to date. <br /> Mr. Gilot noted that they hope to get with the state officials to see if the newly re-surfaced alleys <br /> would qualify the city for more state funding based on adding these areas to the total the city has of <br /> hard-surfaced roadways. The city maintains an Official Inventory which triggers such funding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.