Laserfiche WebLink
CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />MEETING AGENDA <br />August 10, 2021 – 9:30 a.m. <br /> <br />Virtual Meeting Link https://tinyurl.com/2021BPWHybrid <br /> <br /> <br />ELIZABETH A. MARADIK GARY A. GILOT JORDAN V. GATHERS JOSEPH R. MOLNAR MURRAY L. MILLER <br /> <br />Page 3 <br /> <br /> <br />8. REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS <br />A. CSO 18 Backwater Valve Replacement – Project No. 120-017 <br />1. Title Sheet <br />2. Funding: PR-00010974 <br /> <br />9. RESOLUTIONS <br />A. Resolution No. 26-2021 <br />A Resolution of the City of South Bend, Indiana Board of Public Works for the <br />Disposal of Surplus Property <br />1. Description: Retirement of Detective James Taylor’s Firearm <br />B. Resolution No. 27-2021 <br />A Resolution of the City of South Bend, Indiana Board of Public Works for the <br />Disposal of Surplus Property <br />1. Description: Retirement of Sergeant John Riddle’s Firearm <br />C. Resolution No. 28-2021 <br />A Resolution of the City of South Bend, Indiana Board of Public Works <br />Authorizing the Transfer of Real Property to the City of South Bend <br />Redevelopment Commission <br />1. Description: 1210, 1214, and 1200 South Bend Ave. (SR23) <br /> <br />10. AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA <br />A. Emergency Storm Sewer Repair – Selge Construction Co., Inc. <br />1. Description: Cavalier Court Emergency Sewer Repair at Carriage Hills <br />2. Amount: $22,095.06 <br />3. Funding: Sewer Utilities (641.06.602.509.439001) <br />B. Emergency Storm Sewer Repair – Selge Construction Co., Inc. <br />1. Description: Boland & Portage Roundabout <br />2. Amount: $13,640.45 <br />3. Funding: Sewer Utilities (641.06.602.509.439001) <br />C. Amendment No. 1 to Owner-Engineer Agreement – Hanson Professional <br />Services, Inc. <br />1. Description: Design Services for Sewer on W. Poland St. Replacement and <br />Calvert St. Sewer Spot Repair for Roadway Reconstruction, Project No. 121-008 <br />2. Amount: $18,399.68; Adjusted Agreement Total $268,099.33 <br />3. Funding: PO-0007775 <br />D. Amendment No. 1 to Owner-Engineer Agreement – Frost Engineering & <br />Consulting <br />1. Description: Replacement Floor Slab on Orchestra Level for Morris <br />Performing Arts Center Main Level Slab Replacement, Theater Attic Catwalk <br />Design, and Palais Royale Attic Catwalk Load Rating, Project No. 121-029