My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Contract - Relocation of Two (2) Water Service Lines Olive St., Phase I, Proj No 114-064 – Milestone Contractors North, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Award Contract - Relocation of Two (2) Water Service Lines Olive St., Phase I, Proj No 114-064 – Milestone Contractors North, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 2:49:37 PM
Creation date
7/27/2021 2:49:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/27/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER-OFFICE MEMORANDUM <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br />TO: Board of Public Works <br />Anne Fuchs, Clerk <br />FROM: Leslie Biek, P.E., Assistant City Engineer <br />SUBJECT: Award Contract: Olive Ph 1 Water Service Relocation with <br />Milestone Contractors North <br />DATE: 7/15/2021 <br />It is requested the Board of Public Works award a contract to Milestone Contractors North for <br />the relocation of two water service lines as a part of the Olive St Phase 1 project for a price of <br />$21,700. <br />For LPA projects, INDOT handles the construction contract. INDOT performed the public solicitation <br />of bids for the Olive St Phase 1 project and selected Milestone Contractors North as the lowest <br />responsive and responsible bidder. INDOT then works directly with the City on the local participation <br />costs and bills the City directly. <br />During construction, Milestone could not get an INDOT certified subcontractor to perform the 2” <br />copper line stop, so the work was not able to be completed under the INDOT contract. Therefore, the <br />City agreed to pay Milestone directly for the portion of work for the 2" copper line stop installation.
The URL can be used to link to this page
Your browser does not support the video tag.