My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - Additional Srvcs Time & Effort Required Public Bid Expenses for Former Salvation – Alliance Architects
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to PSA - Additional Srvcs Time & Effort Required Public Bid Expenses for Former Salvation – Alliance Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 2:49:30 PM
Creation date
7/27/2021 2:49:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/27/2021
Text box
ID:
1
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:chartz@alliarch.com
ID:
2
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:zhurst@southbendin.gov
ID:
3
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:blamie@alliarch.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From:Chris Hartz <br />To:Zach Hurst <br />Cc:Bill Lamie <br />Subject:RE: Former Salvation Army Roof - quote update <br />Date:Monday, December 21, 2020 4:33:11 PM <br />Zach, <br /> <br />We estimate that our design fee would be no greater than $1500 using the hourly rates for <br />additional services. This assumes modifying the front end documents to be bid in lieu of quote, <br />defining the alternate in the specifications and drawings, participating in a pre-bid <br />conference/meeting, addressing bidder questions, reviewing bids, and providing our <br />recommendation. Construction Administration services would remain unchanged from the previous <br />proposal. Completing the documents for February bidding should not be an issue. <br /> <br />Please let me know if this is acceptable, and we can begin working on these changes shortly. Thanks. <br /> <br /> <br />Christopher Hartz <br />Alliance Architects <br /> <br /> <br /> <br />From: Zach Hurst <zhurst@southbendin.gov> <br />Sent: Monday, December 21, 2020 10:17 AM <br />To: Chris Hartz <chartz@alliarch.com> <br />Cc: Bill Lamie <blamie@alliarch.com> <br />Subject: RE: Former Salvation Army Roof - quote update <br /> <br />Chris- <br /> <br />I was able to secure some more funds for the roof and have some direction. What I’d like to do is <br />prepare some bid documents, instead of quote documents, with the main change being the lower <br />roof coating being an alternate bid item. This way we can hopefully award the more critical upper <br />roof portion if nothing else. Being realistic about bidding timelines, we’d probably be looking to open <br />bids sometime in February, with work taking place over the summer. When we opened quotes and <br />were over the allotted limit, our Board approved a request to advertise for public bids for the <br />project, so I just need the completed plans and manual to move forward. <br /> <br />So what I would need from Alliance would be an estimate of your design fee to revise the drawings <br />and project manual, and your timeline for being able to perform the revisions. I have attached our <br />blank front end bid documents so you can see what will need to be revised on the City side of things. <br />Our agreement for this project included hourly rates for additional services, so an email outlining the <br />added fee would suffice in lieu of an amendment to the agreement. Please let me know what <br />questions or concerns you have – thank you. <br /> <br />Zach Hurst, P.E.
The URL can be used to link to this page
Your browser does not support the video tag.