Laserfiche WebLink
BOARD OF PUBLIC WORKS <br />AGENDA ITEM REVIEW REQUEST FORM <br /> <br /> <br />SUPPLEMENTAL INFORMATION FOR RIVER CROSSING #7 <br /> <br /> <br />PROJECT NEED <br /> <br />The location of River Crossing 7 is in a field on the St. Mary’s Campus. St. Mary’s has provided a <br />path to the site, but the immediate path area leading to the site becomes mud after rain events. As <br />this site is the sole crossing to convey wastewater flow from areas around the Notre Dame Campus, <br />failure to maintain it could result in catastrophic sewage backups. Access to the structure with a <br />Combination Cleaning Machine is impossible when the site it wet. See Figures 1 & 2 below. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Foegley Landscape removed honeysuckle; cleared the area around the site and installed a geotextile <br />fabric and gravel at the site on behalf of the City. Because of their great performance during the <br />initial phase of the project, they were selected to quote on the second phase. Figures 3 through 5 <br />below show how the site looked initially & the restoration made by both City personnel and Foegley. <br /> <br />Rutted access <br />path <br />Soft soil at fence