Laserfiche WebLink
Small Drainage & Repair Division B (616) — Owner: City of South Bend. Storm sewer repairs <br />at different locations around South Bend. 7,1871f pipe, 590 cy excavation, 223 if fencing <br />replacement, 15,76 sy sodding. $100,620.00 Completed: 2019 <br />Description: <br />Hidden Hills Estates (615) — Owner: Hidden Hills Estates. Created 2 cul-de-sacs for the <br />development of Hidden Hills Estates in Cass County Michigan. Earthwork & excavation, 2,175 <br />If of Storm Sewer, 10 manholes, 7401f Curb & gutter $350,878.00 Completed: 2019 <br />Description: <br />Lakeland Riverfront Trail Expansion (614) — Owner: City of Niles & MDNR. Create trailhead <br />on Lakeland Health property along St. Joseph River including ADA accessible observation, <br />fishing platform, boardwalk, and foot vending plaza. $435,237.00 Completed: 2019 <br />Description: <br />Goshen Hospital Loading Dock (599) — Owner: Goshen Health (Sub for DJ Construction). <br />Water main, sanitary sewer, storm sewer, excavation of basement, sheet piling, earthwork. <br />$736,512.00 Completed: 2019 <br />Description: <br />Rodgers Lake Water System Improvements (600) — Owner: Pokagon Band of Potowatomi <br />Indians. 11,445 ft of water main, 10 water main taps, 7 hydrants, 2,220 ft of directional drilling. <br />$1,477,016.00 Completed: 2019 <br />Description: <br />Warsaw W. Center St. Watermain Improvements (604) — Owner: Indiana American Water. <br />Replace 2,795 linear feet of water main with appurtances, 76 linear feet of concrete <br />sidewalk/driveway/curb, 25 square yards of concrete sidewalk/driveway, 3 ADA ramps. <br />Restoration, Landscaping $ 662,154.00 Completed: 2019 <br />Description: <br />Region B Lift Station #2 & #6 Piping Replacement (607) — Owner: LaGrange County <br />Regional Utility District. Replace piping and force main air release valves on 2 lift stations <br />$ 158,500.00 Completed: 2018 <br />Description: <br />Jackson Landscape (603) — Owner: City of Elkhart. Landscape improvements around various <br />locations on the Jackson Blvd project. $ 219,100.00 Complete: 2018 <br />Description: <br />G & G Hauling Geotechnical Lift Station (602) — Owner: City of Warsaw. Subcontract with <br />G&G Hauling. Install wet well, 10" SDR 26 sanitary sewer pipe to manhole Al. Install sanitary <br />manhole Al. Install dewatering, discharge to be onsite 30" storm sewer close to lift station. <br />$ 240,500.00 Completed: 2018 <br />Description: <br />