Laserfiche WebLink
Estimate Provided On:4/13/2021 <br />Estimate Provided By:C. Brach <br />Values Unit Type <br />Multi-Family Dwelling # of Unit Types 22 units <br />Estimated Flow (gpd) for Multi-Family Dwelling 310 per unit <br />Estimated Total Flow for Multi-Family Dwelling 6820 gpd <br />Estimated Total Flow for SBH PSH Hope Ave 6820 gpd <br />ERU calculation 22.000 ERU <br />ERU rounddown 22 ERU <br />Sewer SDC Calculation ($1145 per ERU) <br />Water SDC Calculation ($475 per ERU) <br />Estimated Amount Due for SBH PSH Hope Ave <br />Estimated 10% Discounted Total (Payment in full) <br />Estimate for System Development Charges <br />SBH PSH Hope Ave <br />South Bend, IN <br />(1) For purposes of this section "ERU" shall be defined as an equivalent residential unit which means a single family <br />residence. For purposes of customers that are not single family residences, one (1) ERU shall equal estimated wastewater <br />flows of three hundred ten (310) gallons per day. No customer will be less than one (1) ERU. There will be no partial ERU's. <br />The City shall round down to the closest applicable ERU calculation at all times. <br />(3) System development charges per ERU shall also be collected from existing customers undertaking activities <br />producing a permanent increase in wastewater flow of greater than three hundred ten (310) gallons per day. This <br />subsection shall not apply to an existing customer who has, by contract, purchased reserved capacity from the City so <br />long as the customer's flows remain within the reserved capacity. A permanent increase shall be deemed to have <br />occurred when the average flow rate for six (6) consecutive months exceeds the current flow rate by at least three <br />hundred ten (310) gallons per day. <br />Per the Ordinance of the Common Council of the City of South Bend, System Development Charges are summarized <br />below from Sections 17-79 and 17-80: <br />(2) Except as provided in Subsections (5) and (6) of this section, for every new connection to the South Bend Municipal <br />Sewer Works, a system development charge of one thousand one hundred forty-five dollars ($1,145.00) shall be <br />collected per ERU and additional portion thereof to be connected. All charges shall be billed by the City at the time the <br />application for service is filed. <br />Sec. 17-79. - System Development Charge for Wastewater inside and outside City limits. <br />(4) For multifamily structures (e.g., apartments, condominiums, mobile home communities), each individual unit shall be <br />one (1) ERU. For all other types of structures, the ERU calculation shall be based upon the ratio of Average Daily Flow as <br />computed pursuant to 327 IAC 3-6-11 in relationship to three hundred ten (310) gallons per day. For structures not listed in <br />327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average Daily Flow reported in the sewer <br />capacity certification for the structure and three hundred then (310) gallons per day. <br />35,640.00$ <br />32,076.00$ <br />**Estimate is based on projected uses and calculations provided by owner/consultant** <br />25,190.00$ <br />10,450.00$