Laserfiche WebLink
EXHIBIT B <br />ENGINEER’S ESTIMATE <br />Kyle, <br />I have evaluated the sewer extension to determine an estimated cost. This cost includes the <br />scope associated with completing the sewer extension along Hope Avenue as indicated on sheet <br />C1.2. This scope includes (but is not limited to): <br />• A/E and survey elevations <br />• Excavation of the street <br />• Extension of the sewer line as indicated on the drawing <br />• Installation of new manholes <br />• Repair and pave the street in accordance with City of South Bend Construction Standards <br />and Specifications <br />• Street closure permit and barricades <br /> <br />The total estimated cost for the work is Fifty Five Thousand Dollars ($55,000.00). <br /> <br />As such, a bond of Sixty Eight Thousand Seven Hundred Fifty Dollars ($68,750.00) is required <br />to satisfy the 125% performance bond requirement. <br /> <br /> <br />Sincerely, <br />Alliance Architects, <br /> <br /> <br />Bradley A. White, P.E. <br />Project Engineer <br />