Laserfiche WebLink
Item No. <br />I <br />2 <br />3 <br />4 <br />5 <br />8 <br />6 <br />7 <br />8 <br />9 <br />10 <br />II <br />12 <br />13 <br />14 <br />15 <br />Construction Costs <br />May,2019 <br />Intersection Improvement For US 31 @ Brick/Cleveland Rd <br />South Bend, Indiana <br />Based on Measured Quantities of Preliminary Design <br />Brick/Cleveland Rd <br />Descriotion Assume(%) Quantitv Unit <br />Construction Engineering I I LSUM $ <br />Mob/Demob 3 I LSUM $ <br />Clearing ROW I I LSUM $ <br />Temporary Erosion Control I I LSUM $ <br />Common Excavation 6656 CYS $ <br />Pavement Removal 10,256 SYS $ <br />Subgrade Treatment Type II 19,967 SYS $ <br />Compacted Aggregate No 53 3,419 TON $ <br />PCCP IO" 10,256 SYS $ <br />165 lb/Syd, QC/QA-HMA, 2, 64, Smface, 12.5 mm 330 TON $ <br />275 lb/syd, QC/QA-HMA, 2, 64, lntennediate, 19.0 mm 551 TON $ <br />Asphalt for Tack Coat I TON $ <br />Construction Sign A 10 EA $ <br />Barricade III-A 100 LFT $ <br />Banicade III-8 100 LFT $ <br />Maintaining Traffic 2.5 I LSUM $ <br />Subtotal <br />Contingency 20% <br />Total <br />Unit Cost <br />10,200.00 <br />30,600.00 <br />10,200.00 <br />10,200.00 <br />20.00 <br />15.50 <br />15.00 <br />25.00 <br />55.00 <br />80.00 <br />70.00 <br />500.00 <br />140.00 <br />15.00 <br />15.00 <br />25,500.00 <br />\\ltg-srv\Projects\projects\PS\INDOl\18115-00 US31 Pvmt Des1383328\Project-lnfo\Estimate\Cost Estimate for 115-01.xlsx <br />Extension <br />$ 10,200 <br />$ 30,600 <br />$ 10,200 <br />$ 10,200 <br />$ 133,111 <br />$ 158,973 <br />$ 299,500 <br />$ 85,469 <br />$ 564,097 <br />$ 26,437 <br />$ 38,554 <br />$ 500 <br />$ 1,400 <br />$ 1,500 <br />$ 1,500 <br />$ 25,500 <br />$ 1,397,740 <br />$ 279,548 <br />$ 1,677,300