My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Eagle Way Sewer Extension Proj No. 119-095 - Indiana Earth, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Change Orders
>
Change Order No 2 - Eagle Way Sewer Extension Proj No. 119-095 - Indiana Earth, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 4:36:07 PM
Creation date
7/13/2021 4:36:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/13/2021
Text box
ID:
1
Creator:
Created:
7/13/2021 4:36 PM
Modified:
7/13/2021 4:36 PM
Text:
RWDA
ID:
2
Creator:
Created:
7/13/2021 4:36 PM
Modified:
7/13/2021 4:36 PM
Text:
7/1/2021
ID:
3
Creator:
Created:
7/13/2021 4:36 PM
Modified:
7/13/2021 4:36 PM
Text:
Kyle W. Silveus
Stamp
ID:
1
Creator:
Created:
7/13/2021 4:36 PM
Modified:
7/13/2021 4:36 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: _______________ Project Name: __________________________ Change Order #: ____ <br />DATE INITIATED: BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Attachments: (List documents support change – required) <br />Amount of ☐Increase / ☐Decrease: $____________________ Categories (Pick One): <br />☐ Scope of Work <br />☐ Differing Site Conditions, Changed Conditions <br />☐ Conflicted Specifications and Drawings <br />☐ Failed Materials <br />☐ Error <br />☐ Omission <br />☐ Final Quantity Adjustment <br />☐ _______________________ <br />Previously approved Change Order(s): $___________________ <br />Current Percent of Change: ____________________ % <br />New Total Amount: $____________________ <br />Total Percent of Change: ____________________ % <br />Funding Secured From: __________________________ <br />(filled out by PM) <br />RECOMMENDED BY: <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />APPROVED BY:
The URL can be used to link to this page
Your browser does not support the video tag.