| 
								    T
<br />0
<br />   
<br />  
<br />  
<br />HORIZONTAL
<br />SCALE IN FEET 
<br />400
<br />200 
<br />General Notes Control of Site
<br />information.
<br />proposed excavation.  Visit Indiana811.org for more 
<br />contact to reach member utilities to notify them of your 
<br />start of their project.  Indiana 811 offers a one-point 
<br />must call at least two (2) full working days prior to the 
<br />engaged in excavation using mechanized equipment 
<br />Indiana State Law (IC8-1-26) requires that anyone 2.
<br />work.  
<br />utilities prior to any and all construction or fabrication 
<br />verify the exact locations of all existing underground 
<br />ground evidence was observed.  The Contractor shall 
<br />is no above ground evidence or for which no above 
<br />additional existing underground utilities for which there 
<br />not all inclusive or necessarily reliable.  There may be 
<br />information is provided as general information but is 
<br />marks made upon the ground by others).  This utility 
<br />(including but not limited to: manholes, inlets, poles and 
<br />plans are based upon above ground evidence 
<br />The location of any underground utilities shown on the 1.
<br />Ph: 574-235-9254
<br />Attn: Liz Horvath
<br />South Bend, IN 46601
<br />227 W. Jefferson Blvd., Ste. 1316
<br />City of South Bend Engineering Department
<br />SANITARY & WATER:
<br />email: bdunlop@aep.com
<br />Ph: 614-552-1893
<br />Attn: Barbara Dunlop
<br />Gahanna, OH  43230
<br />700 Morrison Rd
<br />American Electric Power - Transmission
<br />Ph: 574-236-1658
<br />Attn: Antonio Macias
<br />South Bend, IN  46628
<br />2929 Lathrop St
<br />American Electric Power - Distribution
<br />ELECTRIC:
<br />email: pmgriffin@nisource.com
<br />Ph: 574-800-6132
<br />Attn: Phillip Griffin
<br />South Bend, IN  46601
<br />1039 Pennsylvania
<br />NIPSCO
<br />GAS:
<br />Utility Contacts
<br />thoroughfares and adjacent property.
<br />traffic and pedestrians where his operations abut public 
<br />The Contractor shall provide for the safe and orderly passage of 5.
<br /> 
<br />damage of equipment or materials will be granted to the Contractor.
<br />No additional payment or time extension requested due to such 
<br />the Contractor which are stored or stockpiled on the project site.  
<br />resulting to the equipment or construction materials possessed by 
<br />The Owner is not responsible for any damage, flood or otherwise, 4.
<br />barricades, flagmen, etc. at all times of construction operations.
<br />The Contractor shall provide appropriate signage, traffic control, 3. 
<br /> 
<br />Representatives access to the site at all times.
<br />The Contractor shall allow the Owner, Engineer or Owner's 2. 
<br /> 
<br />to the contract.
<br />deemed necessary by the Contractor or Owner shall be incidental 
<br />against dumping.  The cost of any additional security measures 
<br />of and during working hours.  This includes securing the site 
<br />site against unauthorized entrance by persons and vehicles outside 
<br />It shall be the Contractor's responsibility to secure the construction 1.
<br />Express, UPS, etc.) and emergency access to residents at all times during the project.
<br />Contractor to accomodate trash pick up, deliveries of mail and packages (USPS, Federal 19.
<br />repaired.
<br />resulting from construction activities not scheduled for removal shall be replaced or 
<br />and excess material from the site.  Damaged trees, shrubs and other landscape features 
<br />Throughout construction, the Contractor shall collect and remove all construction debris 18.
<br />considered a part of this Contract.
<br />or accessories necessary to complete this work may not be specifically noted but are 
<br />referenced on the Plans, are all to be considered as part of this Contract.  Incidental items 
<br />Standard Specifications, Construction Plans and subsequent details, including details 17.
<br />placing of material on private property of another requires written authorization. 
<br />silt fence.  Stockpile locations are to be evaluated an secured by the Contractor.  The 
<br />create a nuisance or potential erosion hazard. All stockpiles of soil shall be protected by 
<br />Disposal of and stockpiling of excess material shall be done in such a way that will not 16.
<br />cause for additional compensation or a change in the scope of work.
<br />adjustments (approved by the Engineer) prior to demolition.  Such variation shall not be 
<br />responsibility to verify such dimension and details in the field and make necessary 
<br />measurements and are subject to nominal variations.  It shall be the Contractor's 
<br />Existing dimensions and details relative to existing structures have been taken from field 15.
<br />removal, relocation, or replacement.  
<br />pavements, roadways, structures, utilities, and underground facilities not designated for 
<br />property at the site or adjacent thereto, including houses, trees, shrubs, lawns, walks, 
<br />safety and necessary precautions for the safety of all employees, equipment, or other 
<br />The Contractor shall be solely responsible for initiating, maintaining, and supervising all 14.
<br />provided in in the Contract Documents.
<br />during construction shall be replaced by the Contractor at their expense, unless otherwise 
<br />All signs, fences, and delineators damaged by the Contractor or their Subcontractor 13.
<br />all conflicts prior to start of construction.
<br />telephone, pipelines, etc.) and structures in advance of construction and shall eliminate 
<br />The contractor shall locate or have located all existing underground utilities (electric, 12.
<br />contractor's expense.
<br />not in conformance with the specifications is subject to removal and replacement at the 
<br />Any work performed without the approval of the City engineer and/or all work and material 11. 
<br />The Owner shall be notified 24 hours prior to starting each phase of construction.10.
<br />specifications and standard details.
<br />All construction shall be in accordance with the most current adopted City of South Bend 9.
<br />latest edition and the City of South Bend Department of Public Works Standards.
<br />Contract Documents and applicable sections of the INDOT Standard Specifications, 
<br />All excavation, backfilling, grading and compaction shall be in conformance with the 8.
<br />the field prior to bidding, construction, and ordering of materials.
<br />It is the responsibility of the Contractor to verify all dimensions and conditions that exist in 7.
<br />final and conclusive.
<br />meaning of the Construction Plans or Specifications, the decision of the Engineer shall be 
<br />risk and expense.  In the event of any doubt or questions arising with respect to the true 
<br />secure such instruction, the Contractor will be considered to have proceeded at his own 
<br />proceeding with any part of the work affected by omissions or discrepancies.  Failing to 
<br />details, the Contractor shall secure written instruction from the Engineer prior to 
<br />Contractor shall assume full responsibility.  In the event of disagreement and/or special 
<br />immediately report the same to the Engineer before doing any work, otherwise the 
<br />discrepancies with what is shown on the Construction Plans, Contractor must 
<br />conditions affecting the work with the actual conditions at the job site.  If there are 
<br />Prior to commencement of construction, the Contractor shall verify all dimensions and 6.
<br />installation.  Submittals shall be in accordance with the Contract Documents.
<br />project components shall be submitted to the City for review prior to implementation or 
<br />All required shop drawings or product certification information for constructed or supplied 5.
<br />with the Indiana Manual of Uniform Traffic Control Devices (MUTCD), latest edition.
<br />with INDOT Standard Specifications.  Traffic control shall be maintained in accordance 
<br />all phases of construction. Barricades and warning signs shall be provided in accordance 
<br />signs, traffic control devices and warning devices to inform and protect the public during 
<br />The Contractor shall be responsible for the installation and maintenance of adequate 4.
<br /> 
<br />additional compensation will be allowed.
<br />the contract for payment, the work shall be considered incidental to the contract and no 
<br />Whenever the performance of work is indicated on the plans, and no item is included in 3. 
<br />size drawings.
<br />Do not scale dimensions for construction.  Scale, if shown, applies only to ANSI B (11x17) 2.
<br />The Contractor shall limit work to the hours and days allowed by the Contract Documents.1.
<br />Survey Feature Legend
<br />email: jason.gilpin@zayo.com
<br />Ph: 260-570-5677
<br />Attn: Jason Gilpin
<br />Ft. Wayne, IN 46808
<br />1710 Directors Row
<br />Zayo Group
<br />Ph: 574-234-6590
<br />Attn: Mary Jan Hedman
<br />South Bend, IN  46601
<br />121 S Michigan St
<br />ChoiceLight
<br />email: Jay_Castello@cable.comcast.com
<br />Ph: 574-252-2561
<br />Attn: Jay Castello
<br />Mishawaka, IN 46545
<br />1920 E. McKinley Highway
<br />Comcast
<br />Ph: 219-972-5687
<br />Attn: Rich Schulte
<br />South Bend, IN 46601
<br />307 S Main St
<br />AT&T Indiana
<br />COMMUNICATIONS
<br />2
<br />T
<br />C
<br />S
<br />ST
<br />C
<br />GM
<br />G
<br />EM
<br />E
<br />E
<br />E
<br />T
<br />T
<br />FO
<br />WM
<br />W
<br />STOP
<br />ARV
<br />RP
<br />FO
<br />Project Location General PlanUtility Notes
<br />CHECKEDCALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC  Laurel Woods Maintenance ProjectMcCormickEngineeringNKiefer Ditch
<br />Kiefer Ditch
<br />Laurel RdAuten Rd
<br />Auten Rd
<br />Lindenwood Dr S Hamlin CtOakland AveW Laurelwod CtLi
<br />nde
<br />nwood Dr WBirchwood LnAshwood CtAsbury CtGatehouse DrLaurelwood Dr
<br />Merrill Ct
<br />Sprucewood Ln
<br />Ambleside Dr 
<br />Clean Out
<br />Misc. Manhole
<br />Sanitary Manhole
<br />Catch Basin
<br />Dry Well
<br />Inlet Grate
<br />Storm Manhole
<br />Gas Meter
<br />Gas Valve
<br />Electric Transformer
<br />Cable Pedestal
<br />Electric Meter
<br />Electric Manhole
<br />Electric Pedestal
<br />Guy Anchors
<br />Light Pole
<br />Power Pole
<br />Telephone Handhole
<br />Telephone Manhole
<br />Telephone Pedestal
<br />Yard Light
<br />Water Meter
<br />Water Manhole
<br />Water Valve
<br />Satellite Dish
<br />Flag Pole
<br />Mailbox
<br />Misc. Feature
<br />Post
<br />Sign
<br />Stop Sign 
<br />Ornamental Tree
<br />Shrub
<br />Stump
<br />Tree (25"& Up)
<br />Tree (13"-24")
<br />Tree (6"-12")
<br />Tree (Up to 6")
<br />Fire Hydrant
<br />Rocks/Boulders
<br />Chain Link Type Fence
<br />Wood Fence
<br />Telephone Line
<br />Water Line
<br />Cable TV Line
<br />Electric Line
<br />Overhead Line
<br />Gas Line
<br />Storm Line
<br />Sanitary Line
<br />Force Main
<br />Gas Marker
<br />Telephone Marker
<br />Fiber Optic Marker
<br />Legend
<br />Harrison Monument
<br />Electric Marker
<br />Double Post Sign Treeline
<br />Brushline
<br />Bollard
<br />Fiber Optic Line
<br />Air Conditioner Unit
<br />Yard Drain
<br />Roof Drain
<br />Air Release Valve Str.
<br />Curb Stop
<br />Control Point
<br />Fiber Optic Manhole
								 |