Laserfiche WebLink
T <br />0 <br /> <br /> <br /> <br />HORIZONTAL <br />SCALE IN FEET <br />400 <br />200 <br />General Notes Control of Site <br />information. <br />proposed excavation. Visit Indiana811.org for more <br />contact to reach member utilities to notify them of your <br />start of their project. Indiana 811 offers a one-point <br />must call at least two (2) full working days prior to the <br />engaged in excavation using mechanized equipment <br />Indiana State Law (IC8-1-26) requires that anyone 2. <br />work. <br />utilities prior to any and all construction or fabrication <br />verify the exact locations of all existing underground <br />ground evidence was observed. The Contractor shall <br />is no above ground evidence or for which no above <br />additional existing underground utilities for which there <br />not all inclusive or necessarily reliable. There may be <br />information is provided as general information but is <br />marks made upon the ground by others). This utility <br />(including but not limited to: manholes, inlets, poles and <br />plans are based upon above ground evidence <br />The location of any underground utilities shown on the 1. <br />Ph: 574-235-9254 <br />Attn: Liz Horvath <br />South Bend, IN 46601 <br />227 W. Jefferson Blvd., Ste. 1316 <br />City of South Bend Engineering Department <br />SANITARY & WATER: <br />email: bdunlop@aep.com <br />Ph: 614-552-1893 <br />Attn: Barbara Dunlop <br />Gahanna, OH 43230 <br />700 Morrison Rd <br />American Electric Power - Transmission <br />Ph: 574-236-1658 <br />Attn: Antonio Macias <br />South Bend, IN 46628 <br />2929 Lathrop St <br />American Electric Power - Distribution <br />ELECTRIC: <br />email: pmgriffin@nisource.com <br />Ph: 574-800-6132 <br />Attn: Phillip Griffin <br />South Bend, IN 46601 <br />1039 Pennsylvania <br />NIPSCO <br />GAS: <br />Utility Contacts <br />thoroughfares and adjacent property. <br />traffic and pedestrians where his operations abut public <br />The Contractor shall provide for the safe and orderly passage of 5. <br /> <br />damage of equipment or materials will be granted to the Contractor. <br />No additional payment or time extension requested due to such <br />the Contractor which are stored or stockpiled on the project site. <br />resulting to the equipment or construction materials possessed by <br />The Owner is not responsible for any damage, flood or otherwise, 4. <br />barricades, flagmen, etc. at all times of construction operations. <br />The Contractor shall provide appropriate signage, traffic control, 3. <br /> <br />Representatives access to the site at all times. <br />The Contractor shall allow the Owner, Engineer or Owner's 2. <br /> <br />to the contract. <br />deemed necessary by the Contractor or Owner shall be incidental <br />against dumping. The cost of any additional security measures <br />of and during working hours. This includes securing the site <br />site against unauthorized entrance by persons and vehicles outside <br />It shall be the Contractor's responsibility to secure the construction 1. <br />Express, UPS, etc.) and emergency access to residents at all times during the project. <br />Contractor to accomodate trash pick up, deliveries of mail and packages (USPS, Federal 19. <br />repaired. <br />resulting from construction activities not scheduled for removal shall be replaced or <br />and excess material from the site. Damaged trees, shrubs and other landscape features <br />Throughout construction, the Contractor shall collect and remove all construction debris 18. <br />considered a part of this Contract. <br />or accessories necessary to complete this work may not be specifically noted but are <br />referenced on the Plans, are all to be considered as part of this Contract. Incidental items <br />Standard Specifications, Construction Plans and subsequent details, including details 17. <br />placing of material on private property of another requires written authorization. <br />silt fence. Stockpile locations are to be evaluated an secured by the Contractor. The <br />create a nuisance or potential erosion hazard. All stockpiles of soil shall be protected by <br />Disposal of and stockpiling of excess material shall be done in such a way that will not 16. <br />cause for additional compensation or a change in the scope of work. <br />adjustments (approved by the Engineer) prior to demolition. Such variation shall not be <br />responsibility to verify such dimension and details in the field and make necessary <br />measurements and are subject to nominal variations. It shall be the Contractor's <br />Existing dimensions and details relative to existing structures have been taken from field 15. <br />removal, relocation, or replacement. <br />pavements, roadways, structures, utilities, and underground facilities not designated for <br />property at the site or adjacent thereto, including houses, trees, shrubs, lawns, walks, <br />safety and necessary precautions for the safety of all employees, equipment, or other <br />The Contractor shall be solely responsible for initiating, maintaining, and supervising all 14. <br />provided in in the Contract Documents. <br />during construction shall be replaced by the Contractor at their expense, unless otherwise <br />All signs, fences, and delineators damaged by the Contractor or their Subcontractor 13. <br />all conflicts prior to start of construction. <br />telephone, pipelines, etc.) and structures in advance of construction and shall eliminate <br />The contractor shall locate or have located all existing underground utilities (electric, 12. <br />contractor's expense. <br />not in conformance with the specifications is subject to removal and replacement at the <br />Any work performed without the approval of the City engineer and/or all work and material 11. <br />The Owner shall be notified 24 hours prior to starting each phase of construction.10. <br />specifications and standard details. <br />All construction shall be in accordance with the most current adopted City of South Bend 9. <br />latest edition and the City of South Bend Department of Public Works Standards. <br />Contract Documents and applicable sections of the INDOT Standard Specifications, <br />All excavation, backfilling, grading and compaction shall be in conformance with the 8. <br />the field prior to bidding, construction, and ordering of materials. <br />It is the responsibility of the Contractor to verify all dimensions and conditions that exist in 7. <br />final and conclusive. <br />meaning of the Construction Plans or Specifications, the decision of the Engineer shall be <br />risk and expense. In the event of any doubt or questions arising with respect to the true <br />secure such instruction, the Contractor will be considered to have proceeded at his own <br />proceeding with any part of the work affected by omissions or discrepancies. Failing to <br />details, the Contractor shall secure written instruction from the Engineer prior to <br />Contractor shall assume full responsibility. In the event of disagreement and/or special <br />immediately report the same to the Engineer before doing any work, otherwise the <br />discrepancies with what is shown on the Construction Plans, Contractor must <br />conditions affecting the work with the actual conditions at the job site. If there are <br />Prior to commencement of construction, the Contractor shall verify all dimensions and 6. <br />installation. Submittals shall be in accordance with the Contract Documents. <br />project components shall be submitted to the City for review prior to implementation or <br />All required shop drawings or product certification information for constructed or supplied 5. <br />with the Indiana Manual of Uniform Traffic Control Devices (MUTCD), latest edition. <br />with INDOT Standard Specifications. Traffic control shall be maintained in accordance <br />all phases of construction. Barricades and warning signs shall be provided in accordance <br />signs, traffic control devices and warning devices to inform and protect the public during <br />The Contractor shall be responsible for the installation and maintenance of adequate 4. <br /> <br />additional compensation will be allowed. <br />the contract for payment, the work shall be considered incidental to the contract and no <br />Whenever the performance of work is indicated on the plans, and no item is included in 3. <br />size drawings. <br />Do not scale dimensions for construction. Scale, if shown, applies only to ANSI B (11x17) 2. <br />The Contractor shall limit work to the hours and days allowed by the Contract Documents.1. <br />Survey Feature Legend <br />email: jason.gilpin@zayo.com <br />Ph: 260-570-5677 <br />Attn: Jason Gilpin <br />Ft. Wayne, IN 46808 <br />1710 Directors Row <br />Zayo Group <br />Ph: 574-234-6590 <br />Attn: Mary Jan Hedman <br />South Bend, IN 46601 <br />121 S Michigan St <br />ChoiceLight <br />email: Jay_Castello@cable.comcast.com <br />Ph: 574-252-2561 <br />Attn: Jay Castello <br />Mishawaka, IN 46545 <br />1920 E. McKinley Highway <br />Comcast <br />Ph: 219-972-5687 <br />Attn: Rich Schulte <br />South Bend, IN 46601 <br />307 S Main St <br />AT&T Indiana <br />COMMUNICATIONS <br />2 <br />T <br />C <br />S <br />ST <br />C <br />GM <br />G <br />EM <br />E <br />E <br />E <br />T <br />T <br />FO <br />WM <br />W <br />STOP <br />ARV <br />RP <br />FO <br />Project Location General PlanUtility Notes <br />CHECKEDCALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineeringNKiefer Ditch <br />Kiefer Ditch <br />Laurel RdAuten Rd <br />Auten Rd <br />Lindenwood Dr S Hamlin CtOakland AveW Laurelwod CtLi <br />nde <br />nwood Dr WBirchwood LnAshwood CtAsbury CtGatehouse DrLaurelwood Dr <br />Merrill Ct <br />Sprucewood Ln <br />Ambleside Dr <br />Clean Out <br />Misc. Manhole <br />Sanitary Manhole <br />Catch Basin <br />Dry Well <br />Inlet Grate <br />Storm Manhole <br />Gas Meter <br />Gas Valve <br />Electric Transformer <br />Cable Pedestal <br />Electric Meter <br />Electric Manhole <br />Electric Pedestal <br />Guy Anchors <br />Light Pole <br />Power Pole <br />Telephone Handhole <br />Telephone Manhole <br />Telephone Pedestal <br />Yard Light <br />Water Meter <br />Water Manhole <br />Water Valve <br />Satellite Dish <br />Flag Pole <br />Mailbox <br />Misc. Feature <br />Post <br />Sign <br />Stop Sign <br />Ornamental Tree <br />Shrub <br />Stump <br />Tree (25"& Up) <br />Tree (13"-24") <br />Tree (6"-12") <br />Tree (Up to 6") <br />Fire Hydrant <br />Rocks/Boulders <br />Chain Link Type Fence <br />Wood Fence <br />Telephone Line <br />Water Line <br />Cable TV Line <br />Electric Line <br />Overhead Line <br />Gas Line <br />Storm Line <br />Sanitary Line <br />Force Main <br />Gas Marker <br />Telephone Marker <br />Fiber Optic Marker <br />Legend <br />Harrison Monument <br />Electric Marker <br />Double Post Sign Treeline <br />Brushline <br />Bollard <br />Fiber Optic Line <br />Air Conditioner Unit <br />Yard Drain <br />Roof Drain <br />Air Release Valve Str. <br />Curb Stop <br />Control Point <br />Fiber Optic Manhole