My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Laurel Woods Drainage Improvements Proj No. 121-007 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Quotes - Laurel Woods Drainage Improvements Proj No. 121-007 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 4:32:41 PM
Creation date
7/13/2021 4:31:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i <br /> <br />TABLE OF CONTENTS <br />1 EXECUTIVE SUMMARY ..................................................................................... 1 <br />2 PROJECT INFORMATION ................................................................................. 2 <br />2.1 Project Description and Location .............................................................. 2 <br />2.2 Site Description ........................................................................................ 2 <br />3 SUBSURFACE CONDITIONS ............................................................................ 3 <br />3.1 Subsurface Conditions ............................................................................. 3 <br />3.2 Groundwater Conditions .......................................................................... 4 <br />4 DESIGN RECOMMENDATIONS ......................................................................... 5 <br />4.1 Basis ........................................................................................................ 5 <br />4.2 Storm Sewer Recommendations .............................................................. 5 <br />4.3 Structure Foundation Considerations ....................................................... 6 <br />4.4 Dry Wells ................................................................................................. 6 <br />4.5 Pavement Considerations ........................................................................ 7 <br />5 CONSTRUCTION CONSIDERATIONS ............................................................... 8 <br />5.1 Site Preparation ....................................................................................... 8 <br />5.2 Utility/Storm Water Structure Excavations ................................................ 8 <br />5.3 Structural Fill ............................................................................................ 8 <br />5.4 Fill Placement Control .............................................................................. 8 <br />5.5 Construction Observations ....................................................................... 8 <br />5.6 Groundwater Concerns ............................................................................ 9 <br />5.7 Excavation Slope Stability ........................................................................ 9 <br />5.8 Limitations................................................................................................ 9 <br /> <br />FIGURES <br />Figure 1: Site Location Plan <br />Figure 2: Boring Location Plan <br /> <br />APPENDICES <br />Appendix A - Boring Logs <br /> Boring Logs: B-1 through B-4 <br /> Particle Size Distribution Report (2) <br />Appendix B - Field Exploration <br />Log of Soil Boring - General Notes <br />Unified Soil Classification System <br />Field Exploration Procedures <br />Boring Log Preparation & Laboratory Testing Procedures <br />Appendix C - Qualifications <br /> General Qualifications <br /> Contractual Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.