Laserfiche WebLink
10' Utilit <br />y, Dr <br />ai <br />na <br />g <br />e & No <br />n Ac <br />c <br />e <br />s <br />s Es <br />mt. <br />(pe <br />r <br />pl <br />a <br />t <br />) <br />10' Utility, Drainage & Non Access Esmt. (per plat)10' Ut <br />ilit <br />y <br />a <br />nd Dr <br />ai <br />nage <br /> Es <br />mt. <br />(pe <br />r pl <br />at <br />)10' Utilit <br />y <br />a <br />nd Dr <br />a <br />i <br />na <br />ge Es <br />mt. <br />(pe <br />r pl <br />a <br />t <br />)50' Wide AMOCO Pipeline EsmtDR 8012661(Drawn per plat)'50.00RP RP RP RP RP RP RP RP RP <br /> Auten RoadLindenwood Drive WMer <br />r <br />i <br />l <br />l Ct <br />Laurel RoadLaurel Road <br />Laurelwood DriveLindenwood Drive S <br />Lindenwood Drive SBirchwood Lane Laurelwood Dr NSSSTRPSTOPGSTSTRPSTOPSGTARVGGARVCSTRPRPTRPTTRPGGMTTTETRPGMSGMTTEMGMEMGMTGMGMRPRPEMTCEMHORIZONTALSCALE IN FEETCHECKED0 CALCULATEDPrepared For:Prepared By:NSPDLMSouth Bend, IN 466011316 County-City BuildingDepartment of Public WorksCity of South Bend, IndianaF: 574-232-6868P: 574-232-6800South Bend, IN 46617401 E. Colfax Ave, Suite 209McCormick Engineering, LLC Laurel Woods Maintenance ProjectMcCormickEngineering118040Dewatering PlanNKiefer Ditch <br />Kiefer Ditch <br />Str H <br />Str G <br />Str G1 <br />Str F1 <br />Str F <br />Str E <br />Str D <br />Str C <br />Str C1N <br />Str B <br />Crossing Closures (Typ) <br />See Traffic Control Plan for Street <br />Crossing Closures (Typ) <br />See Traffic Control Plan for Street <br />Dewatering Sump Hole <br />Construction Dewatering Pump <br />Secondry Containment <br />Filter Bag on Leveling Pad with Filter Fabric <br />Construction Dewatering Outlet (Typ) <br />Approx 830 lft <br />Construction Dewatering Discharge Line (Typ) <br />Approx 30 lft <br />Pump Intake Line (Typ) <br />the Project. <br />Public Streets outside active working hours each day throughout <br />Dewatering Discharge Line and ramps shall be removed from 6. <br />edition, for all proposed traffic control measures <br />The Contractor shall fully comply with the Indiana MUTCD, latest 5. <br />extent of both ends of any proposed roadway closures. <br />Contractor shall provide lighted Barricades along the full roadway 4. <br />throughout the Project. <br />storm sewer system downstream of existing Str H is prohibited <br />Discharging of Construction Dewatering activites to the exisitng 3. <br />exisitng pond will also be required. <br />Additional pumping from the sewer cleaning activities to the <br />the intrusion of groundwater and surface waters from Kiefer Ditch. <br />within the existing sewer system throughout the project to reduce <br />will require the installation of temporary plugs at various locations <br />In addtion to the discharge line shown, Construction Dewatering 2. <br />Dewatering <br />operation of all equipment needed to provide Construction <br />Contractor is soley responsible for assessing, supplying and 1. <br />Construction Dewatering Notes: <br />Soil Boring B-1 <br />Soil Boring B-2 <br />Soil Boring B-3 <br />Soil Boring B-4